SITE SURVEY OVERVIEW

SITE SURVEY OVERVIEW. INTRODUCTIONS TSS OVERVIEW (Program & System Capabilities) TSS SUPPORT PLAN SITE ACTIVATION SCHEDULE SITE/GROUP ACTIONS SITE SURVEY SCHEDULE QUESTIONS AND ANSWERS. INTRODUCTIONS. MARSHA TIM – Adacel Systems ED KENNEDY – TRW/Northrup Grumman

derica
Download Presentation

SITE SURVEY OVERVIEW

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SITE SURVEY OVERVIEW • INTRODUCTIONS • TSS OVERVIEW (Program & System Capabilities) • TSS SUPPORT PLAN • SITE ACTIVATION SCHEDULE • SITE/GROUP ACTIONS • SITE SURVEY SCHEDULE • QUESTIONS AND ANSWERS

  2. INTRODUCTIONS • MARSHA TIM – Adacel Systems • ED KENNEDY – TRW/Northrup Grumman • SMSGT JON GRAY – HQ AFFSA

  3. Tower Simulation System

  4. Door Location Typical 15’ x 18’ TSS Room

  5. TSS OVERVIEW(System Capabilities) • 270 X 34 degree Field of View • Voice Recognition/Synthesis System • Ability to train all or one tower cab position • (Local, Ground, Flight Data and Coordinator) • Ability to use other Tower databases • Ability to share training scenario information between sites • Ability to change time of day, weather, and visibility • Large aircraft model library (military and civilian)

  6. TSS SUPPORT PLAN • CLS (9 one year options) • 24/7 On-call contractor support (minimal Air Force Maintenance tasks) • Standards of acceptable performance checklist for site use • All spares and repair parts • All packaging, handling, storage, and transportation of spares and repair parts (some critical spares stored on site)

  7. TSS SUPPORT PLAN (cont.) • Training System Support Center (9 one year options) • Software Support • Database creation/modification • Model development • Voice Recognition support • Archive databases and scenarios • Scenario development/support • Site Troubleshooting support • System management/configuration management

  8. ACTIVATION SCHEDULE • Deliver CBI – 19 Sep 03 • Site Installation – 3 Nov 03 • System Verification – 10 Nov 03 • Site Acceptance Test – 10 Nov 03 • On Site Training – 12 Nov 03 • DD-250 – 14 Nov 03

  9. SITE/GROUP TASKS • Identify TSS POCs • System administrator • Primary interface with acquisition team • Coordinate all site visits for the contractor • Assist in site survey and site specific data gathering efforts and coordinate project support agreement • Coordinate TSS personnel training • Coordinate Facility Preparation • Identify Facility which meets size requirements

  10. SITE/GROUP TASKS (cont.) • Minimum requirements • 15’ X 18’ X 8’H Room • HVAC and Power • System generates 25,200 BTU/hr heat • Room Operating Temp 16-30 Degrees Celsius (61-86F) • Power 120 VAC/50/60 Hz Single Phase • 100 Amps single source within room