An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Green City, Clean Waters Green Streets, Complete Streets Delaware Direct Partnership March 31, 2010

  2. $290 million toRestore and Preserve Stream Corridors • $320 million toUpgrade Water Pollution Control Plants • $1.01 billion to‘Green’ 34% of the combined sewer areaby managing stormwater at the source For more information, visit www.phillywatersheds.org.

  3. 8 Green Programs Private Lands Industrial/Commercial/Institutional Homes Parking Alleys, Driveways and Walkways Public Lands • Streets • Schools • Public Facilities • Open Spaces Saylor Grove Stormwater Wetland Philadelphia, PA Springside School “Water Wall” and Rain Garden Philadelphia, PA Friends Center Green Roof Philadelphia, PA

  4. Green Stormwater Infrastructure • A range of soil-water-plant systems that intercept stormwater, infiltrate a portion of it into the ground, evaporate a portion of it into the air, and in some cases slowly release a portion of it back into the sewer system • Acknowledges the symbiotic relationship between land use and water resources

  5. Green Stormwater Infrastructure Tools

  6. What is a good green street? • Minimal utility conflicts • Few to no obstructions upslope of inlets • No existing street trees upslope of inlets • Wide sidewalks • Building setback • Relatively flat street • Large drainage areas

  7. Fewer Design / Implementation Challenges

  8. More Design / Implementation Challenges

  9. Site Selection Process • Identification • Investigation • Selection based upon: • Feasibility and cost-effectiveness • Neighborhood planning • Concurrent projects

  10. Complete Streets Policy directive that streets and roads should provide for all transportation mode users. True Complete Streets require multiple partners and funding sources

  11. Rhawn / Pennypack Princeton Unruh Levick Comly Bridge Buckius Orthodox Castor Allegheny / Delaware

  12. Rhawn Street / Pennypack Street Cartway: 36 feet ROW: 50-60 feet Rhawn Street looking east from rail station • Pros: • Link Holmesburg Junction Station to Pennypack Park & East Coast Greenway • Cons: • Some steep slopes • Limited ROW Intersection of Rhawn & State Rd.

  13. Levick Street Cartway: 64 feet ROW: 80 feet Levick Street looking east from Tulip St. • Pros: • Provide link to Lardner Point Park & East Coast Greenway • Right lane striped for no travel • Cons: • Slopes • Traffic patterns create conflicts with pedestrians and bicyclists Levick at entrance to Tacony-Palmyra Bridge

  14. Buckius Street Buckius looking east toward river at Bridesburg Rec Center • Pros: • Adjacent to Bridesburg Rec Center • Cons: • Riverside trail / park not yet created • Some separate / non-contributing areas Cartway: 32 feet ROW: 44 feet

  15. E. Allegheny Ave. / N. Delaware Ave. Cartway: 60-75 feet ROW: varies, max 122 feet Allegheny Ave. looking east from I-95 • Pros: • Link Monkiewicz Playground, Pulaski Park, & East Coast Greenway • Project awarded TIGER funding • Cons: • Potential conflicts with industrial uses • Some separate / non-contributing areas Corner of Allegheny & Delaware at Pulaski Park

  16. Are we missing any priority connector streets? • All of these streets present unique design and implementation challenges. Which should be our highest priority to move forward? Rhawn / Pennypack Levick Buckius Allegheny / Delaware

  17. Ann Lehigh Cumberland Columbia Marlborough Shackamaxon Frankford Germantown / Laurel Brown Fairmount Spring Garden Callowhill

  18. E. Columbia Avenue Cartway: 26 feet ROW: 50 feet Columbia looking east from Girard • Pros: • Link Palmer Park, Hetzell Playground & Penn Treaty Park • Some projects already in design • Cons: • Very limited ROW • Tree-lined in certain blocks Columbia looking east from I-95

  19. Frankford Avenue Cartway: 36 feet ROW: 58 feet Frankford looking east from Girard • Pros: • NKCDC streetscape project • Cons: • Limited ROW • Some drainage areas are small Columbia looking east to intersection with Delaware Ave.

  20. Germantown Avenue / Laurel Street Cartway: 30-32 feet ROW: 50-60 feet Germantown Ave. looking east • Pros: • PWD Storm Flood Relief project in design • Cons: • Limited ROW Laurel St. looking east toward Delaware Ave.

  21. Spring Garden Street Cartway: 88 feet ROW: 120 feet Spring Garden St. looking east from 2nd St. • Pros: • Vision for Delaware to Schuylkill greenway connector • Cons: • Many utility conflicts have been identified Spring Garden St. looking east from I-95

  22. Are we missing any priority connector streets? • All of these streets present unique design and implementation challenges. Which should be our highest priority to move forward? Columbia Frankford Germantown / Laurel Spring Garden

  23. Race Washington Reed Tasker Snyder

  24. Race Street Cartway: varies from 26-46 ft ROW: varies, approx. 74 ft Race St. looking east from 2nd St. • Pros: • Connection to Race Street Pier • Cons: • Traffic patterns create conflicts with pedestrians and bicyclists • Some separate / non-contributing areas Race St. at Columbus Blvd.

  25. Washington Avenue Cartway: 120-144 feet ROW: 142-176 feet Washington Ave. looking east from 2nd St. • Pros: • Connection to Pier 53 • PWD Storm Flood Relief project in design • Cons: • Some existing trees Washington Ave. at Columbus Blvd.

  26. Tasker Street Cartway: 26 feet ROW: 52 feet Tasker St. looking east to Front St. • Pros: • Direct connection from Pennsport to riverfront • Cons: • Limited ROW • Small drainage areas Tasker St. at Columbus Blvd.

  27. Snyder Avenue Cartway: 44 feet ROW: 74 feet Snyder Ave. looking east from 2nd St. • Pros: • Already striped for bike lanes • PWD Storm Flood Relief project in design • Cons: • Multiple ownership / residential blocks • Some small drainage areas Snyder Ave. looking east from I-95

  28. Are we missing any priority connector streets? • All of these streets present unique design and implementation challenges. Which should be our highest priority to move forward? Race Washington Tasker Snyder