“Have U Heard” Round Table for Kids in Need. Colombo Round Table 1. RT Austria AGM Vienna. Thank You for Hearing Us Austria !!. November 2009. Your Support Made us come close to Their Dream …………………. The World Is Hearing us Today.
E N D
“Have U Heard”Round Table forKids in Need Colombo Round Table 1 RT Austria AGM Vienna
November 2009 Your Support Made us come close to Their Dream ………………….
The World Is Hearing us Today Round Table International Recognizes the Project “Have U Heard” Moreover this project is the first ever Project in Sri Lanka to be received a Round Table International Presidents award of Euro 2500 http://www.roundtable.name/
Currency in Euros Expenses Incurred Thus far Land Cost 25,100 Earth Filling 1,000 Building Temporary Pre-School 1,657 Building the Retention wall 3,052 Construction up to ground floor 4,193 Concrete slab (roof level of ground floor) *12,916 * Includes Funds form RTA and RTI --------------- 47,918 ========= Excluding the land cost They also incur a monthly overhead cost of Approximately - Euro 322
Concrete slab upwards (First Floor) • Structural work 22,874 • Plumbing and sanitary fittings 1,897 • Electrical wiring 2,580 • Doors and windows 1,470 • Painting and Decorating 1,554 • 5% cost escalation 2,165 --------------- 32,577 ======== Projected Expenses in Need Currency in Euros * As per the BOQ Provided
Ear mold fabrication 4,232 • Clinical Audiometer 6,432 • Play Audiometer 4,614 • Accu. Screen (Screening of Newborn Babies) 4,437 • 5% cost escalation 985 --------------- 20,700 ======== Equipment for the Audiology Center Currency in Euros With the proposed center there will also be an monthly overhead of approximately Euro 350
What Round Table can do ? Fund 53,000 Euros 1. Audiology laboratory Auditorium 32,577(Euro) 2. A well equipped Audiology lab : 20,700 (Euro) To measure hearing and obtain audiograms Material & equipment to fabricate Ear molds Equipment & material to repair hearing aids Trained personnel