Summer 2012. A Brief Review of Technology Upgrades at Mead Hall. 11.10.2012 Technology Committee Meeting. Aiken Prep Network Infrastructure. Installed HP Procurve 4000m as core switch Located and identified edge switches Replaced faulty edge switches Simplified topology
E N D
Summer 2012 A Brief Review of Technology Upgrades at Mead Hall 11.10.2012 Technology Committee Meeting
Aiken Prep Network Infrastructure • Installed HP Procurve 4000m as core switch • Located and identified edge switches • Replaced faulty edge switches • Simplified topology • Installed pfSense router / firewall • Established IPSec VPN tunnel connecting campuses • WiFi APs • Installed additional AP • Corrected and matched configuration an all APs
Servers and Services • Mead Hall Domain • Domain Membership for all PCs at each campus • Local domain controller at each campus • Elevated domain functional level to 2003 (soon 2008) • Hyper-V Server 2012 Hosts • Aiken Prep (production) • 2008 R2 domain controller • 2012 file server • St. Thaddeus (in progress) • 2008 R2 domain controller • 2012 file server
Future Upgrades • High bandwidth link between campuses • WiFi network enhancement at both campuses • Raise domain functional level to 2012