1 / 5

CI Integrated Build/Verify/Test

A comprehensive overview of the OOI Cyberinfrastructure (CI) project involving SOA framework, drivers, and UI development. Includes CI architecture, validation tasks, equipment acquisition, and deployment updates.

dgarcia
Download Presentation

CI Integrated Build/Verify/Test

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CI Integrated Build/Verify/Test

  2. CI Integrated Build/Verify/Test Starts With the OOI SE Process and Team • The new OOI CI consists of: • AService Oriented Architecture (SOA) framework called uFrame (Universal Framework) developed by Raytheon Omaha • Aset of dataset/instrument/platform drivers and data product algorithms which plug in to the uFrame framework developed by IO staff • User interface developed by Applied Science Associates (ASA) • The CI architecture & HDWR , integration, test and validation by Rutgers University/OL • Re-constituted System Engineering Process started with generating the Systems Engineering Management Plan (SEMP) Final

  3. The SEMP Final, CONOPS, Use Cases, and CI Requirements Define the Design and the Bridge to Validation • The SEMP Final and updated Integrated Master Schedule (IMS) together define the scope and schedule of the remaining OOI MREFC tasks through complete Commissioning of the OOI • This work includes: • finalizing the OOI Concept of Operations (CONOPS) - Completed • Updating the Use Cases - Completed • Updating the OOI Vocabulary - Completed • Updating the Cyberinfrastructure (CI)Requirements - Completed • Designing, developing, integrating, and testing the OOI Cyberinfrastructure • Design Progressing - Group 4 delivered and in Integration • Initial capability in place for verification • Plan in review for completion • Performing the remaining acquisition of equipment – CI equipment delivered • Deploying and/or turning the remaining marine arrays and platforms - Ongoing • Conditional Acceptance of the Marine Infrastructure and Cyberinfrastructure gives early assessment and time to fix. • Commissioning of the Marine Infrastructure and Cyberinfrastructure occurs when CI is released

  4. Integrated Build Plan September July August May June Commissioning Conditional Acceptance Events Surface Moorings/Endurance/Global/Cabled CSPP Alpha/Beta Alpha Test Beta Test NSF Review Load Test Load Test Initial Capability (Build 4.1) Clustered Cassandra servers Clustered Cassandra server Hardware/Network Build 6 (Not in Plan) Final/datacenter Build 3 Build 4 Build5 6 4.1 CI Build Integration 5 3 V & V Integration V&V V&VV&V Test Procedures 3 4 5 Test Procedures uFrame UI uFrame uFrame uFrame/UI uFrame/UI CI Tasking 6 4.5 4.1 5 5 Bench Live UI C2 Full Array Full Array Cal Cabled Array Data & Test Uncabled Data Calibration/Ingest/metadata Plug-ins Sensors & Algorithms 6 V & V

  5. CI Architecture/Build/Implementation Don/Ivan

More Related