1 / 10

Test & Build Prep

Test & Build Prep. Team 18001. FSR Support Design. Current Status of PCB and Schematic. Work in Progress. PCB finalized and ordered on Feb. 9th. Silicon Base. Test Plans. Corresponds to 20 Engineering Requirements Link to Test plans on EDGE. Survey Activities Plan.

aolani
Download Presentation

Test & Build Prep

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Test & Build Prep Team 18001

  2. FSR Support Design

  3. Current Status of PCB and Schematic Work in Progress. PCB finalized and ordered on Feb. 9th

  4. Silicon Base

  5. Test Plans • Corresponds to 20 Engineering Requirements • Link to Test plans on EDGE

  6. Survey Activities Plan Goal: How comfortable/convenient is using the Glove Controller? Plan to execute after each building & assembling phase: • Ask for volunteers to try out the Glove Controller • Volunteers will provide a rating ranging from 1 to 10; 1 being the most uncomfortable and 10 being the most comfortable • Metric: 1 - 10 • Make surveys on whether people would actually use the Glove controller or not • Ask for reasons why they would use it or would not use it • Polls • If time is an issue • We will try it on ourselves and provide rating without any bias • We will also respond to the surveys and provide reasons for whether we will use it or not without any bias as well

  7. Plan for Next Phase

More Related