Regional Seminar Series The Use of PI at International Power Lee Kean Senior Business Analyst International Power PLC 5th October 2009
Agenda • Introduction to International Power • How PI is used • Value derived from having PI • “Plain Vanilla” PI • Data source for “added value applications” • Real Time Integration with “core applications” • Making a success of your investment • Conclusion • One final tip • Questions
Who Do I Work For? www.ipplc.com
IPR’s Capability 33GW • IPR is a leading independent power generator • 33.2GW (21.4GW net) capacity in operation • 3.3GW (988MW net) under construction.
IPR’s Assets 2 OIL 1430MW GROSS
IPR’s Assets 3 HYDRO 2176MW GROSS
IPR’s Assets 7 COAL 7012MW GROSS
IPR’s Assets 32 GAS 24.5GW GROSS
IPR’s Assets +800 Wind Turbines 1265MW GROSS
Portfolio Approach • Risk mitigation across 5 core regions with fuel diversity • • Balance of contracted and merchant markets • • Access to growth opportunities - Greenfield & acquisitions
How do we use PI? Data historians are typically used to support the following key processes Real ime Graphical & Trend Displays Pattern Recognition and Anomaly Detection Trading Alert Notifications Condition Based Maintenance Operational Shift Logging Online Plant Performance Monitoring
How do we use PI? Data historians are typically used to support the following key processes Real ime Plant Capacity Analysis Under Performance Investigation Dispute Resolution Process Analysis & Optimisation Failure Analysis
How do we use PI? Data historians are typically used to support the following key processes Real ime Environmental Reporting Settlement Calculation (Invoicing) Efficiency Monitoring Reliability Monitoring Management Reporting (KPI’s) Plant Degradation Analysis Key Asset Performance Monitoring
How do we use PI? Data historians are typically used to support the following key processes Real ime Final Settlement Calculation & Invoicing Outage Planning Plant Capability Projections Generate Plant Production Profiles
“Plain Vanilla PI” – Case Study 1 Commissioning New Gas Fired Station • Plant Operators identified over sensitive steam attemperation control • Proved to equipment supplier using historical data in PI • Equipment supplier refurbished valves valued at $240 000 • Cost of un-planned outage avoided • PI had been installed for only a few months
“Plain Vanilla PI” – Case Study 2 Commissioning New Gas Fired Station • A Plant Operator proved Inlet Guide Vanes (IGV) positioning on one unit had drifted 1% over a 3 month period • A sustained loss of plant performance • Equipment supplier rectified the mechanical fault in the linkage of the IGV’s. • PI had only been installed for a few months.
“Plain Vanilla PI” – Case Study 3 Hydro Pumped Storage Optimising Plant Operations
Derived Value - Data source for “added value applications”
PI as Data Source: Case Study 1 Thermal Performance Monitoring • Proved to gas supplier that gas flow measurements were incorrect • Gas supplier reimbursed > £1million
PI as Data Source: Case Study 2 Gas Turbine Fleet EOH Monitoring / Outage Planning • Issue • Planning production and outages • Communication • Operations • Maintenance • Fleet Outage Group • Trading • Finance • Solution • PI Data & Trading Data • PI Tags, PI Processbook, PI-ACE, Rt Web Parts
PI as Data Source: Case Study 2 Fleet View Point
PI as Data Source: Case Study 2 Unit View Point
Derived Value – Real Time Integration with “core” applications
Real Time Integration – Case Study 1 • Operational Shift Logging – Aims • Provide a flexible and configurable solution for recording, and reporting on significant plant events • Improve the quality, consistency and search-ability of information • Simplify ad hoc reporting tools
Real Time Integration – Case Study 1 • Operational Shift Logging – Benefits • Provides a single focal point for plant data • Reduces the number of independent reports • Releases users from repetitive logging of plant state changes by automatically importing PI data
Real Time Integration – Case Study 1 Operational Shift Logging – Plant Overview RT Web Parts are used within a SharePoint environment to provide a common overview of the plants key performance indices to the operations team.
Real Time Integration – Case Study 1 Operational Shift Logging – Plant Status Similarly PI Processbook, Datalink and RT Web Parts used to allow operators to record and display the status of the plant in place of a traditional white board
Real Time Integration – Case Study 1 Operational Shift Logging – Automated Entries PI digital tag changes are used to trigger automated event entries within predefined operator logs
Real Time Integration – Case Study 2 • Condition Based Maintenance • Aims • Optimise Maintenance Effectiveness by: • Changing planned maintenance intervals: • From “time” based (e.g. every 3 months) • To “condition” based (e.g. every 2000 running hours) • Benefits • 1 plant reduced boiler maintenance costs by $120 000pa
Real Time Integration – Case Study 2 PI Server(s) Maximo PIMax Software Interface Maximo Meter Physical Equipment Asset • Additional Properties include: • Early Warning • Generate Work Order in advance Meter 1234 hrs • Examples: • Running Hours • No of Starts • No of Trips • Example Limits: • 1000 Hours • 50 Starts • 10 Trips PM
Making a success of your investment • Needs management support • Requires a culture change • Needs appointed “PI Champions” • Install before commissioning • Annual user meetings: • Internal • OSIsoft Conferences
Conclusion • PI is a functionality rich product with excellent support • Has huge potential for obtaining benefits • Cost savings • Maximising Income • Managing risks • To get value from it • Needs management support • Requires a culture change • Needs appointed “PI Champions”
One Final Tip To err is human, but to really mess things up requires a computer