100 likes | 331 Views
SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA. Chris Taylor (AD) Stuart Fowell (DAD). SOIS REPORT. CURRENT GROUPS WITHIN AREA. Application Support Services WG Subnetwork Services WG Wireless WG. SOIS REPORT. B. ATTENDANCE METRICS. SOIS REPORT. SUMMARY TECHNICAL STATUS.
E N D
SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA Chris Taylor (AD) Stuart Fowell (DAD)
SOIS REPORT • CURRENT GROUPS WITHIN AREA • Application Support Services WG • Subnetwork Services WG • Wireless WG
SOIS REPORT B. ATTENDANCE METRICS
SOIS REPORT • SUMMARY TECHNICAL STATUS • Application Services Working Group • Goal: Develop SOIS Application support layer services and associated protocols if required • Working Group Summary progress: • Remaining Red Books Drafted • All books internal WG review • Prototyping underway for all services • Plug and Play concepts finalised • Alignment/prototyping with BioNet initiated • Problems and Issues: • Difficulties in keeping plug play generic and applicable to all targets. Some reassessment needed and possible addition book. • Working Group Summary Situation:
SOIS REPORT • Application Services Working Group • Work Group Planning • Update all books after WG review • Revisit MTS Red Book • Establish formal plan for Interoperability testing • Continue prototyping • Review approach to Plug & Play architecture • Initiate discussions with other area (SMC)
SOIS REPORT • Subnetwork Services Working Group • Goal: Develop SOIS Subnetwork Services and associated protocols if required • Working Group Summary progress: • Red Books updated following prototyping • ECSS Milbus extension protocol (compliant with SOIS) released • SpaceWire compliant protocol initial draft spec reviewed • European industry (Saab Space) initiating development of SOIS compliant products • Problems and Issues • Need to release Magenta books to provide stable reference • Working Group Summary Situation:
SOIS REPORT • Subnetwork Services Working Group • Work Group Planning • Update all books after WG review • Agency review and release all books • Establish formal plan for Interoperability testing • Continue – extend prototyping • Analyze use of existing approaches (EDS) for device description (joint activity with ASWG)
SOIS REPORT • 3. Wireless WG • Goal: CCSDS focus group for wireless technologies. Make recommendations pursuant to standardization of applicable wireless network protocols • Working Group Summary progress: • Green book updated and under WG review • Magenta Books on schedule for: • Intra-vehicle wireless • Asset management (RFID) • Assembly, Integration and Test (AIT) • Lunar workshop held • Liaison with SLS initiated • Problems and Issues: • Wireless has broad applicability beyond scope of SOIS • Working Group Summary Situation:
SOIS REPORT • Wireless WG • Working Group Planning: • Complete Green Book • Develop Magenta books • Initiate in cross-area cooperation (SLS)
SOIS REPORT D. SUMMARY: MAJOR ACCOMPLISHMENTS, S’08 MEETING • Application Services WG Status • Time Access service Red book 2 (updated/prototyping) • File and Packet Store Red book 2 (updated/prototyping) • Device Data Pooling service Red book 2 (updated/prototyping) • Message Transfer service Red book 1 (updated/prototyping) • Device Access service Red book 2 (updated/prototyping • Device Enumeration service Red Book 1 (updated/prototyping) • Device Virtualisation Service Red Book 1 (updated/prototyping) • Subnetwork Services WG • Packet service Red book 2 (updated/prototyping) • Test Service Red book 2 (updated/prototyping) • Memory Access service Red book 2 (updated/prototyping) • Device Discovery Service Red book 2 (updated/prototyping) • Synchronisation service Red book 2 (updated/prototyping) • Wireless • Green BookSecond Draft under WG review • Magenta Books Planned