1 / 15

NEW JICA and Project Evaluation

NEW JICA and Project Evaluation. Ryutaro Koga Evaluation Department Japan International Cooperation Agency. Presentation points. Reorganization of JBIC and JICA on Oct.1,2008 New JICA ’ s Organization Change of ODA project evaluation in Japan Evaluation System of New JICA

dior
Download Presentation

NEW JICA and Project Evaluation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NEW JICA and Project Evaluation Ryutaro Koga Evaluation Department Japan International Cooperation Agency

  2. Presentation points • Reorganization of JBIC and JICA on Oct.1,2008 • New JICA’s Organization • Change of ODA project evaluation in Japan • Evaluation System of New JICA • Current issues of evaluation in New JICA

  3. Reorganization of JBIC and JICA • Restructuring of government financial institutions (triggered by Prime Minister Koizumi’s initiative) • OOF wing of JBIC is merged with other 3 domestic banks establishing JFC • ODA wing of JBIC is merged with JICA • ODA agency reform • One stop service window of ODA

  4. JBIC S&M National. Agri. JBIC JFC Reorganization of JBIC and JICA 3 domestic banks MOFA Grant JICA ODA operations 60% OOF operations 40% NEW JICA MOFA

  5. Organization of New JICA • One stop ODA agency of Japanese Gov. : Technical assistance, Grant assistance and Loan assistance • Synergy is expected, as well as coherence of evaluation method, but to what extent?

  6. The Vision and 4 missions Inclusive and dynamic development • Tackling issues caused by globalization • Equitable growth and poverty reduction • Governance improvement • Realization of Human security

  7. Strategies for fulfilling missions • Inclusive assistance:3 schemes, policies, institutions, human developments, infrastructure development • Successive assistance:each stage of disaster prevention, emergency assistance, early rehabilitation, mid-term or long-term assistance • Promoting development partnership:trying to become a best partner, understanding needs, effectively and speedily support self-help of partner countries, universities, NGOs, private companies, local governments, international players. • Research and its external dissemination:establishing JICA Institute, provision of intellectual values in the development assistance arena based on fields experiences with collaborations with int’l partners

  8. Change of Implementation Entities of ODA operations in Japan Before Grant Assistance By MOFA (160 Bil. Yen) (about 1.6 Bil. US$) Technical Assistance By JICA (170 Bil. Yen) (about 1.7 Bil. US$) ODA Loan Assistance By JBIC (770 Bil. Yen) (about 7.7 Bil. US$) 60% 40% After Grant/Technical/ Loan Assistance By New JICA (1040 Billion Yen) (About 10 Billion US$) Grant Assistance By MOFA

  9. Evaluation System of New JICA Target: • Technical cooperation projects • Loan assistance projects • Grant assistance projects • Program assistance

  10. Evaluation System of New JICA Methodologies: • Ex-ante to Ex-post evaluation • External Evaluation • Publication • DAC 5 principles for Loan projects and Project Technical Assistances

  11. “Plan Do Check Action”Cycle Action Plan Do Check

  12. Issues of evaluation in New JICA • Program evaluation (3 scheme coordinated programs) • Coordination and coherence of evaluation methods between 3 schemes (ex. ratings) • Impact evaluation (more robust measuring of results, result based evaluation, cost efficiency) • Thematic evaluation (ex. contributions of big scale infrastructures on non-hardware related aspects) • Grant projects evaluation (transfer from MOFA)

  13. A Sample Evaluation : Bangladesh 4 donor evaluation • Since 2005, Evalunet of DAC advocated country level evaluation in order for verifying AID impacts. Bangladesh, as a suitable target. • Participants: • World Bank • ADB • DFID • Japan (JICA) Which, share about 60% to 80% of all AID to Bangladesh. • Sept. 2009CAE (expected) of WB is axis and other donors participate by inputting to CAE or conducting sector related evaluation. • JICA (previous JBIC) takes part of transport sector evaluation based on its experience. ( on going by Feb 2009)

  14. 4-donor Joint evaluation :Scheme chart (3)4-donor Joint Evaluation Report (June,2009) Focused on aid coordination Feed in to CAE FY2008 and after Feed in • WB CAE (Governance, Growth, Human Development, Agriculture, Environment, gender, Aid Effectiveness) (2) ADB Sector Survey (Urban, Water, Education) (2) JICA Sector Survey (Transport) ADB CAPE (FY 2008 ) Japan CAE (After FY2008) Feed in Addition by DFID, ADB

  15. Thank you. For further information on our evaluation http://www.jica.go.jp/english/operations/evaluation/

More Related