1 / 1

RUS – WG Status

RUS – WG Status. Status Revival by members of the European OMII – Europe project New charter with slightly new goals and new milestones developed Two specs: RUS “core” and on top of this the RUS “advanced” spec.

dirk
Download Presentation

RUS – WG Status

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. RUS – WG Status • Status • Revival by members of the European OMII – Europe project • New charter with slightly new goals and new milestones developed • Two specs: RUS “core” and on top of this the RUS “advanced” spec. • RUS “core” specification will be slightly revised and finalized for public comment (Mar 2007 – planned submit to editor for public comment) • Independent Implementations of the RUS interface • GridSAM (used within the UK e-Science infrastructures) • UNICORE (used within the DEISA infrastructure) • SweGrid Accounting System (SGAS) (component of Globus Toolkits) • Distributed Grid Accounting System (DGAS) (used within the EGEE) • Planned: LCG – RUS (used within OSG, GridPP) • Interoperability work within OMII – Europe • Interoperability of RUS interfaces among UNICORE, SGAS, and DGAS • Next Steps • Collect experiences and feedback from early implementations • Feature poll for a RUS “advanced” specification on top of core RUS spec. 1

More Related