1 / 24

System Definition Review 3/27/07 Team 1

Introduction Target Market Concept of Operations Design Requirements Concept Selection Payload Description Performance Constraints Representative Layout Requirements Compliance Future Work. System Definition Review 3/27/07 Team 1. John Horst Jared Odle Keith Fay Boyce Dauby.

dlomeli
Download Presentation

System Definition Review 3/27/07 Team 1

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. AAE 451 - Team 1 - 3/27/07 Introduction Target Market Concept of Operations Design Requirements Concept Selection Payload Description Performance Constraints Representative Layout Requirements Compliance Future Work System Definition Review3/27/07Team 1 • John Horst • Jared Odle • Keith Fay • Boyce Dauby • Andrew Kovach • Akshay Raje • Jason Darby • Manish Handa

  2. AAE 451 - Team 1 - 3/27/07 Introduction Target Market Concept of Operations Design Requirements Concept Selection Payload Description Performance Constraints Representative Layout Requirements Compliance Future Work • Mission Statement: • The objective is to provide a fixed-wing, semi-autonomous, long-endurance, continuous-area coverage unmanned aerial vehicle to relay communication of tactical importance for an extended period of time. • Department of Defense • Front-line tactical communication relay to/from warfighter • Relief Agencies/FEMA • Front-line tactical communication relay to/from ground first responders • Commercial Customers • Damaged service locations, scouting of new telecommunication markets, and remote locations

  3. AAE 451 - Team 1 - 3/27/07 Introduction Target Market Concept of Operations Design Requirements Concept Selection Payload Description Performance Constraints Representative Layout Requirements Compliance Future Work Competition Communication Satellites Lighter-Than-Air Vehicles Broadcast Towers Shadow 200 Hunter Predator

  4. Introduction Target Market Concept of Operations Design Requirements Concept Selection Payload Description Performance Constraints Representative Layout Requirements Compliance Future Work • Takeoff • Conventional runway takeoff (Autonomous or Remote Operation) • Distance from Takeoff to Coverage Area • Transmitting/Receiving • Ground Forces  UAV  Command Station or other Ground Forces • Control • Autonomous with manual backup/mission override • Remote Operators • Trained military UAV pilots controlling from Mission Command Center • Level of Threat • Design for high threat environment CONOPS AAE 451 – Team 1 – 3/27/07 4

  5. Introduction Target Market Concept of Operations Design Requirements Concept Selection Payload Description Performance Constraints Representative Layout Requirements Compliance Future Work CONOPS http://www.afcea.org/signal/articles/templates/SIGNAL_Article_Template.asp?articleid=507&zoneid=4 • Provide continuous area coverage for and extended time period • Multiple UAVs in system • Redundancy by overlapping coverage • Survivability via electronic countermeasures AAE 451 – Team 1 – 3/27/07 5

  6. AAE 451 - Team 1 - 3/27/07 Introduction Target Market Concept of Operations Design Requirements Concept Selection Payload Description Performance Constraints Representative Layout Requirements Compliance Future Work Design Requirements

  7. AAE 451 - Team 1 - 3/27/07 Introduction Target Market Concept of Operations Design Requirements Concept Selection Payload Description Performance Constraints Representative Layout Requirements Compliance Future Work Pugh’s Method • An iterative approach to synthesize novel concepts • Choose Criteria • Clarify Concepts • Choose Baseline Concept • Choose relative rankings (+,-,S) • Create hybrids better than any first generation concepts • Iterate

  8. AAE 451 - Team 1 - 3/27/07 Introduction Target Market Concept of Operations Design Requirements Concept Selection Payload Description Performance Constraints Representative Layout Requirements Compliance Future Work A F K B H J

  9. AAE 451 - Team 1 - 3/27/07 Introduction Target Market Concept of Operations Design Requirements Concept Selection Payload Description Performance Constraints Representative Layout Requirements Compliance Future Work P N L 0 M

  10. AAE 451 - Team 1 - 3/27/07 Pugh’s Method Rankings

  11. Current Concept AAE 451 - Team 1 - 3/27/07 Introduction Target Market Concept of Operations Design Requirements Concept Selection Payload Description Performance Constraints Representative Layout Requirements Compliance Future Work • Twin-Engine, Retractable Tail-Dragger Landing Gear • Unswept Tapered Low Wing, Conventional Tail • Wingspan = 55 ft • Taper Ratio = 0.4

  12. AAE 451 - Team 1 - 3/27/07 Introduction Target Market Concept of Operations Design Requirements Concept Selection Payload Description Performance Constraints Representative Layout Requirements Compliance Future Work Communications Payload • AJCN - Adaptive Joint C4ISR Node by BAE Systems *Volume approximated by avionic density: 0.02 – 0.03 ft3/lb

  13. AAE 451 - Team 1 - 3/27/07 Introduction Target Market Concept of Operations Design Requirements Concept Selection Payload Description Performance Constraints Representative Layout Requirements Compliance Future Work Additional Payload • Camera • MicroPilot - Dayview/Nightview • Interchangeable with Thermal Imaging Mode • 25x Optical Zoom • 320 x 240 Resolution • 3 Watts of Power • 2.2 pounds • (Ø) 4.3 in x (H) 8.3 in

  14. AAE 451 - Team 1 - 3/27/07 Introduction Target Market Concept of Operations Design Requirements Concept Selection Payload Description Performance Constraints Representative Layout Requirements Compliance Future Work Additional Payload • Missile Warning/Countermeasures - BAE Systems • AN/ALQ-156(V) Warning System • 425 Watts of Power • 50 pounds • 20.4 × 10.2 × 7.6 in • AN/ALE-47 Dispensing System • Automatic Response • Protects Against: Air Interceptor (AI), Anti-Aircraft Artillery (AAA), and Surface-to-Air Missiles (SAMs) • 20 pounds • Fielded on 1,307 Aircraft • 43.7 x 39.5 x 26.8 in

  15. Constraint Diagrams AAE 451 - Team 1 - 3/27/07 Introduction Target Market Concept of Operations Design Requirements Concept Selection Payload Description Performance Constraints Representative Layout Requirements Compliance Future Work • Assumptions:

  16. AAE 451 - Team 1 - 3/27/07 Introduction Target Market Concept of Operations Design Requirements Concept Selection Payload Description Performance Constraints Representative Layout Requirements Compliance Future Work Constraint Diagrams

  17. AAE 451 - Team 1 - 3/27/07 Introduction Target Market Concept of Operations Design Requirements Concept Selection Payload Description Performance Constraints Representative Layout Requirements Compliance Future Work Preliminary Carpet Plot

  18. Design Mission AAE 451 - Team 1 - 3/27/07 Introduction Target Market Concept of Operations Design Requirements Concept Selection Payload Description Performance Constraints Representative Layout Requirements Compliance Future Work 2 3 6 7 4 5 0 1 8 9 • 0-1 Taxi/Takeoff • 1-2 Climb to Cruise Altitude • 2-3 Cruise to Target • 3-4 Change to Loiter Altitude • 4-5 Loiter • 5-6 Change to Cruise Altitude • 6-7 Cruise to Runway • 7-8 Descend • 8-9 Land/Taxi

  19. Design Mission AAE 451 - Team 1 - 3/27/07 Introduction Target Market Concept of Operations Design Requirements Concept Selection Payload Description Performance Constraints Representative Layout Requirements Compliance Future Work • 500 ft takeoff • Cruise to/from combat area • Altitude: 15,000 ft AGL • Distance: Up to 100 nm • Loiter above combat area • Altitude: 15,000 ft AGL • Velocity: 80 kts • Endurance: Up to 20 hrs • 500 ft landing

  20. Sizing Codes AAE 451 - Team 1 - 3/27/07 Introduction Target Market Concept of Operations Design Requirements Concept Selection Payload Description Performance Constraints Representative Layout Requirements Compliance Future Work • MATLAB • Used to generate current constraint diagrams and preliminary carpet plots • FLOPS • Current issues involve parametric optimization, variable definitions, and power-to-thrust conversion • ACS • Currently refining accuracy of variables • Carpet plots possible, accuracy questionable

  21. AAE 451 - Team 1 - 3/27/07 Component Layout Introduction Target Market Concept of Operations Design Requirements Concept Selection Payload Description Performance Constraints Representative Layout Requirements Compliance Future Work 1 4 2 5 3 • 1. Engine Nacelles • 2. Camera • 3. AJCN • 4. Avionics • 5. Fuel Tanks

  22. AAE 451 - Team 1 - 3/27/07 Component Layout Introduction Target Market Concept of Operations Design Requirements Concept Selection Payload Description Performance Constraints Representative Layout Requirements Compliance Future Work

  23. Compliance Matrix AAE 451 - Team 1 - 3/27/07 Introduction Target Market Concept of Operations Design Requirements Concept Selection Payload Description Performance Constraints Representative Layout Requirements Compliance Future Work * Distance to Mission Area

  24. AAE 451 - Team 1 - 3/27/07 Introduction Target Market Concept of Operations Design Requirements Concept Selection Payload Description Performance Constraints Representative Layout Requirements Compliance Future Work Future Work • Sizing • Update Carpet Plots • More Accurate Results from ACS and FLOPS • Component Selection • Airfoil, Engine, and Propeller Selection • Performance • Define Operating Envelope • Structures • Structural Layout • Material Selection • Stability and Control • Center of Gravity • Static Margin

More Related