120 likes | 223 Views
Post Harvest Management & Technology. 22 March 2012. NCML’s Network. 952 Locations. 18 States + 2 Union Territory. 6. 57 Commodities. 37. 3. 24. +16,000 Clients. 18. 39. 1. 3. AUM – Rs 60 Billion. 1. 9. 50. 26. Cross Border Trade Transaction. 4. 1. 29. 52. 117. 50. 42.
E N D
Post Harvest Management & Technology 22 March 2012
NCML’s Network 952 Locations 18 States + 2 Union Territory 6 57 Commodities 37 3 24 +16,000 Clients 18 39 1 3 AUM – Rs 60 Billion 1 9 50 26 Cross Border Trade Transaction 4 1 29 52 117 50 42
Permanent Footprints • 44 Locations • 12 States 3 3 7 2 4 2 1 VIDISHA UJJAIN 4 8 4 2 4 DEWAS BIKANER
Post Harvest Management Technology used elsewhere is not necessarily the best for use under conditions in India Many of the recent developments in post-harvest technology have come about in response to the need to economize on labor, materials, and energy use, and to protect the environment. PRSERVATION OR Containment of Post Harvest Loss • Latest jargon is “PHL”
Maize Post Harvest Loss (PHL) Is this the solution
Why Silo projects have not created replicas • Mega Silo Structures without any state subsidy can be successful when the other activities in the supply chain also develop • Incoming : Mega Silo being filled in by opening bagged cargo result in operational incompatibility • Outgoing: Rail Rakes being filled again by re-bagging the bulk cargo will AGAIN create incompatibity • Individual projects have remained only as pilots
% variation in Maize Prices vs Silo Construction materials (Base 2003)
World’s Oldest Mega Grainery for Post Harvest Management Faults the economic thinking for failing to consider the most appropriate scale for an activity Raises the question on the notion that “Bigger is Better" Location :Patna Capacity :140,000 MT Year: 1786
POSTCOSECHA Programme (1983-2003) in Central America has been a success. Approximately 336,000 tons of grain worth US$ 75 milo could be saved from loss. Growers Benefit Tinsmith Benefit
Suggested Post Harvest Mgmt. Models • Homegrown solutions and need based scales • Labour efficiency by optimum used of technology • Use of material for structures suited for the climatic regions • Cost Efficiency from farm-gate to warehouse & warehouse to destination • Nationwide Post Harvest Loss Grid and plugging the gaps • Grading Sorting and Testing
Thank You National Collateral Management Services Ltd.Gayatri Towers954, Appasaheb Marathe Marg,Prabhadevi,Mumbai 400025. Tel: +91 22 4041 9191Fax: +91 22 4041 9193 website: www.ncmsl.com