1 / 11

CONTOH PENGGUNAAN AHP :

CONTOH PENGGUNAAN AHP :

doctor
Download Presentation

CONTOH PENGGUNAAN AHP :

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CONTOH PENGGUNAAN AHP : Southcorp Development mendirikan dan mengelola mal di Amerika. Perusahaan telah menidentifikasi 3 (tiga) lokasi potensial untuk proyeknya, yaitu : Atlanta (A), Birmingham (B), dan Charlotte (C). Perusahaan juga telah mengidentifikasi 4 (empat) kriteria utama sebagai dasar perbandingan lokasi, yaitu : (1). Pangsa Pasar Pelanggan (termasuk ukuran pasar dan populasi pada tiap tingkat usia), (2) Tingkat Pendapatan, (3) Infrastruktur (termasuk listrik dan jalan raya), dan (4) Transportasi (yaitu : kedekatan dengan jalan layang untuk memudahkan akses pelanggan dan antaran dari pemasok).

  2. Tujuan perusahaan keseluruhan adalah memilih lokasi terbaik. Tujuan ini berada pada puncak hirarki masalah di atas. Pada tingkat hirarki berikutnya (kedua) ditentu-kan bagaimana kontribusi keempat kriteria dalam pen-capaian tujuan. Pada tingkat hirarki masalah ditentukan bagaimana tiap alternatif lokasi memberikan kontribusi pada tiap kriteria. 1. Lokasi-Pangsa Pasar : A B C A B C

  3. 2. Lokasi-Pendapatan 3. Lokasi Infrastruktur A B C A B C A A B B C C 4. Lokasi-Transportasi A B C A B C

  4. MENGEMBANGKAN PREFERENSI DLM KRITERIA 1. Lokasi-Pangsa Pasar : A B C Rata-rata ------------------------------------------------------------ A 0,5455 0,3333 0,6250 0,5012 B 0,1818 0,1111 0,0625 0,1185 C 0,2727 0,5556 0,3125 0,3803 ------------------------------------------------------------ Jumlah = 1,0000

  5. 2. Lokasi-Pendapatan A B C Rata-rata ------------------------------------------------------------ A 0,2400 0,3750 0,2308 0,2819 B 0,0400 0,0625 0,0777 0,0598 C 0,7200 0,5625 0,6923 0,6583 ------------------------------------------------------------ Jumlah = 1,0000

  6. 3. Lokasi-Infrastruktur A B C Rata-rata ------------------------------------------------------------ A 0,2000 0,2258 0,1111 0,1790 B 0,6000 0,6774 0,7778 0,6850 C 0,7200 0,5625 0,1111 0,1360 ------------------------------------------------------------ Jumlah = 1,0000

  7. 4. Lokasi-Transportasi A B C Rata-rata ------------------------------------------------------------ A 0,1667 0,5277 0,0909 0,1561 B 0,5000 0,6316 0,7273 0,6196 C 0,3333 0,3958 0,1818 0,2243 ------------------------------------------------------------ Jumlah = 1,0000

  8. Matriks Preferensi Kriteria : --------------------------------------------------------------------------- Kreteria Lokasi P-Pasar Pendapatan Infrastruktur Transport --------------------------------------------------------------------------- A 0,5012 0,2819 0,1790 0,1561 B 0,1185 0,0598 0,6850 0,6196 C 0,3803 0,6583 0,1360 0,2243 ---------------------------------------------------------------------------

  9. Merangking Kriteria : ------------------------------------------------------------------------------- Kriteria Pasar Pendapatan Infrastruktur Transport ------------------------------------------------------------------------------- Pasar 1 1/5 3 4 Pendapatan 5 1 9 7 Infrastruktur 1/3 1/9 1 2 Transportasi ¼ 1/7 ½ 1 -------------------------------------------------------------------------------

  10. Matriks normalisasi (rata-rata) : ------------------------------------------------------------------------------- Kriteria Psr Pndpt Infra Transp Rata-rata ------------------------------------------------------------------------------- Psr 0,1519 0,1375 0,2222 0,2857 0,1993 Pndpt 0,7595 0,6878 0,6667 0,5000 0,6535 Infra 0,0506 0,0764 0,0741 0,1429 0,0860 Transp 0,0380 0,0983 0,0370 0,0714 0,0612 ------------------------------------------------------------------------------- 1,0000 -------------------------------------------------------------------------------

  11. Mengembangkan Rangking Keseluruhan : ----------------------------------------------------------------------------------------- Lokasi Skor ----------------------------------------------------------------------------------------- Charlotte 0,5314 Atlanta 0,3091 Birmingham 0,1595 ------------------------------------------------------------------------------------------

More Related