10 likes | 209 Views
Business Services. High risk medications (Interim). 1 x HP6 (P) 2 x HP5 (p) 1 x HP4 (P) 1 x AO3 (P). 1 x AO5 (P). Health Protection Unit Senior Director (SES2 (H)). Food Safety Standards and Regulation Team Team Leader (HP7). Medicines Regulation and Quality Team Team Leader (MMO12).
E N D
Business Services High risk medications (Interim) 1 x HP6 (P) 2 x HP5 (p) 1 x HP4 (P) 1 x AO3 (P) 1 x AO5 (P) Health Protection Unit Senior Director (SES2 (H)) Food Safety Standards and Regulation Team Team Leader (HP7) Medicines Regulation and Quality Team Team Leader (MMO12) PH Regulation System Manager and Licensing Team Team Leader (AO8) Private Health Team Team Leader (NRG-10PS 03) Radiation Health Team Team Leader (HP7) Work areas Work areas 1 x NRG8 (P) 1 x NRG7(P) 1 x AO3 (P) Work areas HP5 x 3 (P) HP4 x 3 (P) HP3 x 1 (P) Compliance and Approvals Advice Clinical Policy Surveillance and Compliance 2 x HP5 (P) 2 x HP4 (P) 2 x HP3 (P) 1 x AO6 (P) 2.8 x AO4 (P) 1 x AO3 (P) 1 x AO2 (P) 2 x NRG7 (P) 2 x HP4 (P) 0.6 x AO2 (P) Licensing and Records Policy and Reporting • 1 x HP6 (P) • 2 x HP5 (P) • 3 x HP4 (P) • 0.6 x HP3 (P) • 1 x AO3 (P) • 2 x HP6 (P) 1 x AO5 (P) 2 x AO4 (P) 4 x AO3 (P) 1.6 x AO2 (P) 1 x NRG9 (P) 1.72 x HP5 (P) 2 x HP4 (P) 1 x AO7 (P) 1 x AO5 (P) Regulatory Risk Assessment and Standards Team Leader (S24) Office of the Senior Director 1 x HP5 (P) 2 x AO4 (P) 1 x AO3 (P) 1 x A02 (p) Work areas Note: Proposed to transition in Risk Assessment Water 1 x HP6 (P) 2 x HP5 (P) 3 x HP4 (P) 1 x HP6 (P) 1 x HP5 (P) 3 x HP4 (P) Note: the proposed interim structure may be modified following the consultation period. Business Services positions are captured in the ODDG interim structure. Legend (P) Permanent Position (T) Transitional Position