MOVIDA WP4 - Inspection campaigns Matjaž Grmek, ApE Kick- off meeting, Bologna, 27 May 2011
Work Package 4: Inspection campaigns Task 4.1 Recruiting the inspectors Task 4.2 Development of a code of conduct for inspections Task 4.3 First Inspection Campaign (autumn 2011) Task 4.4 IC for AC systems (summer 2012) Task 4.5 IC for heating systems (autumn/winter 2012)
WP4: Deliverables D4.1 Codeof conductfor the inspectors >> M4 - August 2011 D4.2 3Reportson recruitment activities (ECUBA) >> M6- October 2011 (1.) D4.3 Report onpreliminaryinspection campaign D4.4 Report on2. inspection campaign for AC systems D4.5 Report on3.inspection campaign for heating systems 4
T4.1 Recruiting the inspectors At the kick-off meeting, partners agree on common criteria for recruitments (minimum professional experience and knowledge pre-requisite for the inspectors of the different waves of the campaign). Inspectors operating in the first campaign should already have a sound basic knowledge of HVAC O&M and/or analysis. Each partner defines recruitment activities and possible incentives to facilitate the recruitment of inspectors in each region. This could entail the organisation of meetings with local SME’s associations. The detailed programme of each campaign is captured in a report to the EU Advisory Committee, before the start of the campaigns.
T4.2 Development of a code of conduct for inspections • Technicians accepting to participate in the pilot campaign will sign an agreement, including a code of conduct, prepared by the WP leader (ApE) and accepted by all partners. • Examples: • ENFORCE • ITI HVAC • ACCA • HRAI (of Canada) • etc