20 likes | 143 Views
SXC integration and test. Instrument simulator Structural Thermal Model Instrument end-to-end test. SXC end-to-end test. Telescope. Detector. Ground segment. Integration. Deliver of FM subsystems to SXC consortium. El. continuity. Functional test. Required for end-to-end
E N D
SXC integration and test Instrument simulator Structural Thermal Model Instrument end-to-end test
SXC end-to-end test Telescope Detector Ground segment Integration Deliver of FM subsystems to SXC consortium El. continuity Functional test • Required for end-to-end • SXC end-to-end test plan • Test facility • EGSE • MGSE ( mechanical support, hoisting, container etc) • SCOE ( feedthrough, bus-extenders etc.) • Operators and other instrument specialists • Horizontal position No energy calibration No FOV alignment End-to-end No SXC – EMC test alignment Deliver to IKI SXC system Integration and test