1 / 1

ESA Documentation Timeline For Construction Projects

ESA Documentation Timeline For Construction Projects. Project Footprint. Advanced Plans (90 %). Plans, Specification and Estimate (PS&E). Preliminary Plans (30 %). Bid Let. 10 mo. 9 8 7 6 5 4 3 2 1.

donat
Download Presentation

ESA Documentation Timeline For Construction Projects

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ESA Documentation Timeline For Construction Projects Project Footprint Advanced Plans (90 %) Plans, Specification and Estimate (PS&E) Preliminary Plans (30 %) Bid Let 10 mo. 9 8 7 6 5 4 3 2 1 Submit Formal BA (LAA) Receive Biological Opinion/Take Statement (LAA) or Letter of Concurrence (NLAA) Submit In-Formal BA (NLAA) Pre-consultation 1

More Related