1 / 14

Senior Project Fall 2009

Senior Project Fall 2009. Phases I, II, III Sean M. Cunningham Architectural Engineering Technology. Project Program. Symmetry. Etymology: A harmonic arrangement of parts. A relations of parts and proportion. Water Ripples: Symmetric from center. Multiple heights per ripple.

donoma
Download Presentation

Senior Project Fall 2009

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Senior Project Fall 2009 Phases I, II, III Sean M. Cunningham Architectural Engineering Technology

  2. Project Program

  3. Symmetry • Etymology: • A harmonic arrangement of parts. • A relations of parts and proportion. • Water Ripples: • Symmetric from center. • Multiple heights per ripple. • Multiple distances between each ripple. • Void at the centerpoint.

  4. Implementing to Site

  5. Schematic Site Design

  6. Schematic Site Design

  7. Schematic Site Design

  8. Conceptual Building Design

  9. Conceptual Building Design A B C D

  10. Schematic Floor Plan

  11. Preliminary Unit Design Single & Double BDRM Units

  12. Schematic Exterior

  13. Schematic Exterior

  14. Questions and Comments

More Related