1 / 7

FW Update 5/02/07

FW Update 5/02/07. MFW Latest problems RFT Looses Phase Lock Real 53 MHz connected to the RFT at MI-10 on Feb 20, 2007. Apparently did not fix this problem We will come up with a study plan A0 Loss Monitor Testing. MFW. Problem: P-Bar Injection 8Gev. MFW.

Download Presentation

FW Update 5/02/07

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. FW Update 5/02/07 • MFW Latest problems • RFT Looses Phase Lock • Real 53 MHz connected to the RFT at MI-10 on Feb 20, 2007. • Apparently did not fix this problem • We will come up with a study plan • A0 Loss Monitor Testing

  2. MFW Problem: P-Bar Injection 8Gev

  3. MFW • P-Bar Injection 8Gev after reset

  4. New Loss Monitor Test

  5. Test Loss Monitor at A0 Update

  6. Pulsed LED Signal

  7. A0 Loss Monitor Test

More Related