70 likes | 265 Views
Low voltage power supplies and crates - news. ESE-BE / LVPS and crates service. Low voltage power supplies and crates “team” members Zhengwei Gao (part time with pool activities) Technician LVPS and crates (Wiener & CAEN) – Testing From 1 st Sept. on: Sylvain Mico Technician
E N D
Low voltage power supplies and crates - news vincent.bobillier@cern.ch
ESE-BE / LVPS and crates service • Low voltage power supplies and crates “team” members • Zhengwei Gao (part time with pool activities) • Technician • LVPS and crates (Wiener & CAEN) – Testing • From 1st Sept.on: Sylvain Mico • Technician • PS (LV and HV) and crates activities • Vincent Bobillier • Technical engineer • Coordination, technical DB, user support • Highly appreciated help: • Pool reception: Logistical support • Evelyne Dho: Administrative support for purchase and maintenance contracts • Ralf Spiwoks: Technical DB maintenance • Markus Joos: Autotest rig SW support vincent.bobillier@cern.ch
ESE-BE / LVPS and crates service • Activities • CAEN & Wiener equipment • Managing & coordinating the purchase & maintenance contracts. • User support for LVPS and crates equipment. • Repair / verification services. • Evaluation of new equipment. • CAN Branch PSU • Ongoing support (occasional tests and repairs). • Test system and technical database maintenance • New activities since the last section meeting: • xTCA evaluation project (development of test tools) • Additional maintenance contract for Iseg equipment (and support to users) vincent.bobillier@cern.ch
ESE-BE / LVPS and crates service CAN Branch PSU Activities (illustrations) xTCA evaluation CAEN & Wiener equipment Test systems and technical database maintenance ISEG equipment vincent.bobillier@cern.ch
ESE-BE / LVPS and crates service Equipment base and 2011 purchase and fault report requests Caen Total: 209 2010: 286 Wiener Total: 73 2010: 66 vincent.bobillier@cern.ch
ESE-BE / LVPS and crates service Verification tests performed by the service 2011 2010 vincent.bobillier@cern.ch
ESE-BE / LVPS and crates service • Coming next… • uTCA and ATCA evaluation tests (PSU, cooling units, shelf managers, etc.) • LVPS and crate maintenance • Plan large scale preventive maintenance during LS1. • Start discussing preliminary technical requirements for new bulk power supplies for Phase II upgrade • ISEG HVPS • Get familiar with ISEG equipment to be able to give support to users • Building up of a test bench for the Iseg HV modules vincent.bobillier@cern.ch