1 / 11

Tackle Engineering

Tackle Engineering. We Tackle the Tough Jobs. Proposed Developments for New Park and Recreation Center in Alpha, NJ. Presented to the Alpha Borough Council Thursday, February 28, 2002. Site Location. Alpha Borough Vulcanite Avenue and Springtown Road Size – 39.07 Acres. Tackle Engineering.

dowdend
Download Presentation

Tackle Engineering

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Tackle Engineering We Tackle the Tough Jobs Proposed Developments for New Park and Recreation Center in Alpha, NJ Presented to the Alpha Borough Council Thursday, February 28, 2002

  2. Site Location • Alpha Borough • Vulcanite Avenue and Springtown Road • Size – 39.07 Acres Tackle Engineering

  3. Scope of Work • Design a Regional Detention Basin • Design Recreation Center • Consider Renovation or Removal of Pool • Increase Parking Capacity • Consider Additional Athletic Fields and Courts • Consider Revenue-Generating Options • Consider Options to Improve Aesthetics of Park • Investigate Funding Options Tackle Engineering

  4. Site Plan Tackle Engineering

  5. Close-up of Recreation Center Tackle Engineering

  6. Close-Up of Athletic Fields Tackle Engineering

  7. Recreation Center Floor Plan • Highlights • basketball gymnasium/All-purpose room • Kitchen facilities • New wrestling room • studio room • Small Classroom • Additional Storage Tackle Engineering

  8. Cost Estimate • Recreation Center~$1,000,000.00 • Bike Path ~$40,000.00 • Grading ~$210,000.00 • Basin, Amphitheatre, Paving, etc. ~$250,000.00 Total Cost ~ $1,500,000.00 Tackle Engineering

  9. Possible Outside Funding Sources • Small Cities -Up to $400,000 available • Federal Domestic Assistance -Up to $300,000 from Urban Park and Recovery Program -$68,000 average award from Outdoor Recreation Development Program • Green Acres -Up to $500,000 available Tackle Engineering

  10. Possible Local Funding Sources • Community Fundraising • Fees to use the recreational center • Charge admission to events at the Amphitheatre Tackle Engineering

  11. THANK YOU Questions? Tackle Engineering

More Related