ERTMS deployment experience in Turkey: Mersin - Toprakkale and Gebze - Köseköy lines Leone Fenzi Istanbul, April 2

ERTMS deployment experience in Turkey: Mersin - Toprakkale and Gebze - Köseköy lines Leone Fenzi Istanbul, April 2 nd 2014. Presentation Agenda. Ansaldo STS: About Us. ERTMS/ETCS: the System. Ansaldo STS: ERTMS/ETCS Experiences in Greenfield Projects.

dragon
Download Presentation

ERTMS deployment experience in Turkey: Mersin - Toprakkale and Gebze - Köseköy lines Leone Fenzi Istanbul, April 2

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ERTMS deployment experience in Turkey: Mersin - Toprakkaleand Gebze - Köseköylines Leone Fenzi Istanbul, April 2nd 2014
  2. Presentation Agenda Ansaldo STS: About Us ERTMS/ETCS: the System Ansaldo STS: ERTMS/ETCS Experiences in Greenfield Projects Ansaldo STS: ERTMS/ETCS Experiences in Brownfield Projects Ansaldo STS Answers to Signalling Projects Challenges Page2
  3. About us: Ansaldo STS History Ansaldo STS: Over a century of innovation around the World, and continuing Gio. Ansaldo e C. Founded1853 in Genoa, Italy By Giovanni Ansaldo Union Switch and Signals (US&S) Founded1881 In USA By George Westinghouse Company des Signaux (CSEE) Founded1902 In France By Fernand Cumont and Baron d’Empain Transferred to Finmeccanica In 1948 AnsaldoTransporti (ATR) Created in 1966 Acquired by ATR In 1988 Acquired by ATR 49% in 1989 100% in 1996 Ansaldo Signal NV Established 1996 Ansaldo STS Established 2006 Page3
  4. About us: Ansaldo STS Business Lines Ansaldo STS delivers a full range of Railway and Mass Transit Transportation Solutions and Signalling Systems: Freight Lines Conventional Metros High Speed Lines Main and Suburban Lines Security Systems Tramways and Light Rails Driverless Metros Page4
  5. Presentation Agenda Ansaldo STS: About Us ERTMS/ETCS: the System Ansaldo STS: ERTMS/ETCS Experiences in Greenfield Projects Ansaldo STS: ERTMS/ETCS Experiences in Brownfield Projects Ansaldo STS Answers to Signalling Projects Challenges Page5
  6. The ERTMS/ETCS What, Why & How ERTMS/ETCS enforced by the Law in Europe …butenforced by the Market all around the World: Page6
  7. ERTMS in Turkey: TCDD’s <<Vision 2023>> Thanks to the economical and technical benefits granted by the Interoperability and because of its flexibility, robustness and proven-in-use results, ERTMS/ETCS has been chosen by TCDD as the signalling system to implement its growth plan Source: TCDD Website Page7
  8. Presentation Agenda Ansaldo STS: About Us ERTMS/ETCS: the System Ansaldo STS: ERTMS/ETCS Experiences in Greenfield Projects Ansaldo STS: ERTMS/ETCS Experiences in Brownfield Projects Ansaldo STS Answers to Signalling Projects Challenges Page8
  9. Ansaldo STS “Greenfield” ERTMS References L1 and/or L2 Greenfield projects (brand new lines) – new Interlocking + ATP (incl. ERTMS) Turkey: Gebze-Köseköy Line (ERTMS L1) Page9
  10. Turkish Greenfield Lines – ERTMS/ETCS L1 Gebze-Köseköy Line – Length 56 km Max Speed (with Level 1) 160 km/h Signalling Scope of Work Interlocking “Multistation” Traffic Control System (1 CTC) ERTMS Level 1 Automatic Block Audio Frequency Track Circuits Point machines Power supply (On Line double conversion UPS) Page10
  11. Turkish Greenfield Lines – ERTMS/ETCS L1 Gebze-Köseköy Line – Project Status Interlocking/ETCS Engineering/Basic Design: completed Hardware Design: completed Materials / Installation: ≈ 25% done Commissioning: April/May 2014 RAMS / Verification activities: April/May 2014 Page11
  12. Presentation Agenda Ansaldo STS: About Us ERTMS/ETCS: the System Ansaldo STS: ERTMS/ETCS Experiences in Greenfield Projects Ansaldo STS: ERTMS/ETCS Experiences in Brownfield Projects Ansaldo STS Answers to Signalling Projects Challenges Page12
  13. Ansaldo STS “Brownfield” ERTMS References L1 Brownfield projects (existing lines) – Interlocking revamping and ETCS to be added Turkey: Mersin-Toprakkale & Boğazköprü-Yenice Lines Page13
  14. Turkish “Brownfield” ERTMS/ETCS Lines Boğazköprü-Yenice and Mersin-Toprakkale– length 430 km Single track: Bogazkopru-Yenice & Section Adana-Toprakkale = 352 km Double track: Mersin-Adana = 78 km Total number of stations = 33 Signalling Scope of Work Twelve Interlocking “Multistation” (each one controlling up to three stations) Traffic Control System (Two Central Posts: Kayseri & Adana) ERTMS Level 1 Automatic Block Level Crossings Line track circuit audio frequency Point machines Power supply with two Uninterrupted Power Supply (UPS) Page14
  15. Turkish “Brownfield” ERTMS/ETCS Lines Boğazköprü-Yenice and Mersin-Toprakkale– Project Status Loop extension works completed at 97% “Precommissioning and Commissioning” activities performed for the Interlocking 09 (Mersin, Tirmil and Taskent) “Precommissioning activities” almost completed on Interlocking 08 (Durak; Belemedic; Hacikiri) Design delivered to Customer; Installation ongoing Page15
  16. Presentation Agenda Ansaldo STS: About Us ERTMS/ETCS: the System Ansaldo STS: ERTMS/ETCS Experiences in Greenfield Projects Ansaldo STS: ERTMS/ETCS Experiences in Brownfield Projects Ansaldo STS Answers to Signalling Projects Challenges Page16
  17. Product Upgrade  “WSP” Platform “WSP”: Wayside Standard Platform – ASTS new Platform for Infrastructure Applications: Interlocking ERTMS CBTC Features: New WSP Platform SIL 4 is derived from already existing 2x2oo2 vital platform already in revenue service in the biggest Italian Electronic Interlocking (Pisa Central Station) WSP satisfies high performances functional and availability requirements: Better Performances Higher Connectivity Higher Reliability Higher Maintainability WSP allows high Flexibility in signalling application (Interlocking centralized/distributed / Gateway / Radio Block Centre / Zone Controller) WSP embeds New Field Device Controllers: flexible, less space/power consuming, cheaper Page17
  18. ASTS Scalable Approach to Testing Completely simulated environment Target IXL connected to simulated environment Test of Field Device connections Test of Field Device connections Test of complete real System Page18
  19. Ansaldo STS: ready for TCDD’s <<Vision 2023>> Togetherwe can make the Vision come True! Source: TCDD Website Page19
  20. Thank You for your kind attention www.ansaldo-sts.com