210 likes | 396 Views
Project Plan, Task Checklist, Estimates Project Prototyping. Objectives Introduction of Project Checklist Estimate Spreadsheet Compile Detailed Project Plan, Estimates, Gantt Chart Introduction to Prototyping Techniques Determination of Best Prototype Strategy
E N D
Project Plan, Task Checklist, EstimatesProject Prototyping • Objectives • Introduction of Project Checklist Estimate Spreadsheet • Compile Detailed Project Plan, Estimates, Gantt Chart • Introduction to Prototyping Techniques • Determination of Best Prototype Strategy • Introduction to Power Supply Design Resources • 4 Major Deliverables • Team & Individual: Overall Project Plan (due for P2) • Team: Prototype Plan • Individual: Schematic and Layout of Example: Thermal Sensor Circuit • Team: Schematic and Layout of Prototype PCB’s (due for P2)
Excel Task Estimation Tool • Project Level Task Estimation Sheet • Manhours Totalize at bottom of Sheet • Material $ Totalize at bottom of Sheet • Data Is Entered into Beige Shaded Blocks Only ! • Start/End Date should be realistic and be dependent on other tasks • Use Week.Day Numbering (ie. Class Week #, Monday=1, Sunday=7) • Example: 4.4 = 4th class week, Thursday • Customize for your own use by • Number of Design Blocks • Cut/Paste the Detailed Design Section for Each Block Owner • Use as Project Plan for Tracking Team Members to Weekly Deliverables
Excel Task Estimation Tool • Project Level Task Estimation • System Design Tasks • Detailed Design Blocks from Next Sheets • Material $ and Manpower Hrs Totalize in the Green
Excel Task Estimation Tool • Project Task Estimation Tool • Verification & Integration Tasks • Presentation, Report and Validation • Manhours Totalize at bottom of Page • Material $ Totalize at bottom of Page
Excel Task Estimation Tool • Block Level Task Estimation Sheet • Manhours Totalize at bottom of Sheet • Material $ Totalize at bottom of Sheet • System Design (Block Definition) Tasks • Detailed Design Tasks • Customize for your own use by • Number of Design Blocks • Cut/Paste the Detailed Design Section for Each Block Owner
Project Plan, Task Checklist, EstimatesProject Prototyping • Deliverables - Team • For Each Team: Completed Excel task template for Project Level Tasks with Block level tasks integrated for project totals • Two Summary Powerpoint Slides incl Gantt chart
Project Plan, Task Checklist, EstimatesProject Prototyping • Deliverables - Individual for each Block • For Each Block: Completed Excel template for Block Level Tasks • For Each Block: Create Block Line Info for Team Level Prototyping Summary Plan
Project Plan Summary Templates • Overall Project Plan Summary Slide Contents: • 1st Slide: Estimation-Reconciliation Summary • Total Manpower Estimated vs Available (from lab 1) • Total Material $ Estimated vs Available (from lab 1) • ~ % of total manpower for system design tasks, detailed design tasks, verification tasks, and documentation tasks • Suggested down/up scope if needed • 2nd Slide: Project Plan Graphical Summary • Create single page high level GANTT chart for entire project • Show chronological interdependencies (example: can’t prototype until parts are procured, can’t procure parts until part list is compiled, etc)
Project Plan, Task Checklist, EstimatesProject Prototyping • Deliverables - Team • Complete 7 prototyping plan step from lecture slides • Summarize your prototyping plan in the single power point table slide (see template)
Basic Electronic Assembly and Test • Deliverables – Individual: Develop the schematic and layout files for the Example Thermal Sensor Circuit to exactly match the layout shown. The PCB design should encompass the following requirements • Dimensions of 1.5” x 2.2” • 2 Layers (double sided) • Through Hole + 1 SMT Part • Placements as Shown for all parts • 25 mil power & ground traces, 10 mil signal traces • 56 mil power & ground input pads with silkscreen Labels • 56 mil output signal pads You may use any eCAD Software Package ExpressPCB is suggested due to simplicity and tutorials
Example: Temp Sensor Circuit • 3 ICs: LM35 SO8, OP07 Dip 8 • 6 Capacitors: Ceramic Monolithic Axial • 3 Resistors: 0.125W Axial 10 Total Nodes
NetInterconnections +5V U1-P8 C3-P1 Vt U1-P1 R1-P1 Vp2 U2-P3 R1-P2 Vb U2-P2 U2-P6 R3-P1 +12V U2-P7 U3-P7 C1-P1 C4-P1 -12V U2-P4 U3-P4 C2-P1 C5-P1 Vn3 U3-P2 R3-P2 C6-P1 Vp3 U3-P3 R2-P2 Vout U3-P6 C6-P2 Gnd U1-P1 C1-P2 C2-P2 C3-P2 C4-P2 C5-P5 R2-P1 Netlist for Thermal Sensor Circuit Trace the Schematic to Cover All Net Connections
ExpressPCB Freeware eCAD Software • Available at www.expresspcb.com Version 5.4.0 or Later • Download & Install Software from above link (first check to see if SW is already on PC) • Read Through Help Section – • Quickstart Tutorial for ExpressSCH • Quickstart Tutorial for ExpressPCB NOTE: To Copy from ExpressPCB and ExpressSCH, use the Print Scrn key from the keyboard, then when in Powerpoint or Word, use cntrl-V to paste the screen view.
Basic Electronic Assembly and Test • Deliverables – Team: Develop the schematic and layout files for printed circuit board implementation of your Prototype boards. Use the 12 steps and guidelines as shown in the lecture slides. • Schematic File (.sch) and PPT Slides • Bill of Materials incl package types • Layout File (.pcb) and PPT Slides of Silkscreen, Top, Bottom and any internal layers NOTE: To Copy from ExpressPCB and ExpressSCH, use the Print Scrn key from the keyboard, then when in Powerpoint or Word, use cntrl-V to paste the screen view.