20 likes | 275 Views
Geyser - Class-1, MFV placing at the time of packing. This is the Multi function valve Put Separate in the Thermocol as shown in picture. MFV in Plastic body at the time of Packing. This is The MFV. MFV in Metal body at the time of Packing.
E N D
Geyser - Class-1, MFV placing at the time of packing This is the Multi function valve Put Separate in the Thermocol as shown in picture. MFV in Plastic body at the time of Packing This is The MFV MFV in Metal body at the time of Packing At the time of product installation assemble the Multi Function Valve in Inlet Pipe without any Changes in Multi Function Valve.
Geyser - Class-1, Draining Procedure Procedure to Drain the water from tank to prevent the Scaling in Element & Tank. Before Draining the water remove the Screw from MFV by screw Driver then open the Lever as shown in Picture 2. After finish the Draining it is must again tighten the screw in MFV properly as shown in Pic. 1. After Before Screw Lever Pic. 1 Pic. 2