Measure E Town Hall. November 24, 2003. Donna Jones Dulin Gilbane Building Co. Parking Lots A & B. One-Way Perimeter Road. Measure E - Major Project Timeline. Science Center. The site of the Science Center looking toward the CDC on 10/28/02. The Science Center one year later.

dunn
Download Presentation

Measure E Town Hall

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Measure E Town Hall November 24, 2003 Donna Jones Dulin Gilbane Building Co

  2. Parking Lots A & B

  3. One-Way Perimeter Road

  4. Measure E - Major Project Timeline

  5. Science Center The site of the Science Center looking toward the CDC on 10/28/02 The Science Center one year later

  6. Science Center The exterior showing the metal siding and the support structure. The Old OTI trailers were located here. This is the walkway between two of the buildings.

  7. Science Center Crane lifting the air handling units on to the roof. Units are for the heating and air-conditioning. This is the roof showing the exhaust vents used for extracting air from the fume hoods & restrooms, etc. Also shows the support poles for the piping.

  8. Interior of Science Center One of the labs showing the acid waste pipes. The interior of the lecture hall showing the floor vents.

  9. Parking Structure The parking structure will be located in lot C. Lot C will be closed from 1 Dec 2003.

  10. Parking Structure Footprint

  11. Parking Structure Elevations

  12. Student Community Services The SCS building is located behind the ATC, on the present site of staff lot A. Staff lot A will be closed from 24 Nov 2003.

  13. Student Community ServicesElevation

  14. Kirsch Environmental Center The Kirsch Center will be located in the South West Corner of campus, on the present site of the tennis courts. The courts will be closed at the end of Dec.

  15. Kirsch Center Elevation

  16. No Fuss Buss

  17. Parking Options Staff carpool parking Vallco ‘No Fuss Bus’ drop off and pick up Location of Vallco parking lot Open Lots: A B Compact C Perimeter Rd D Open Lots: Flint J K I F E

  18. Measure E Web Site Quick News Update for Fall 2003 & Today’s Town Hall Presentation www.deanza.edu/MeasureE/update