An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. INSTITUTEFORSTUDIESAND POWER ENGINEERING 02- July 2012

  2. TIMISOARA BUCURESTI In BriefYour strategic partner in developing investments projects • more than 60 years of sustained activity • private company since 1996 • promoting complex consulting and engineering services for local and global clients from public and private sectors • leader in the field of environmental engineering since 2006 ISPE, through the Energy & Environment Division • offering integrated solutions for a sustainable energy future at regional, national and local level. • QEHS applied according to ISO 9001, ISO 14001, BS OHSAS 18001 and ISO/CEI 27001 Bucharest Timisoara

  3. Shareholders General Assembly Supervisory Board CHAIRMAN and C.E.O. Ioan Dan Gheorghiu Research & Development Department Anca Popescu Human Resources Division Cristinel Ocnaşu QEHS - Integrated ManagementSystem General Secretary Celestin Alexandrescu Information & Documentation Human Resources MANAGING DIRECTOR Ovidiu Apostol Occupational HS & Professional Training BusinessDevelopment Division Energy & Environment Division Carmencita Constantin Power Transmission & Distribution Division Mihail Coteanu Timişoara Subsidiary Dumitru Gârdan Project Management Mihai Dumitrescu IT & C Division Dragoş Pascale Financial Division Maria Pop-Moldovan Power Systems Studies Process Controlling Studies and Projects Financing Marketing & Contracting Public Relations & Communication Thermomecanical Systems HV Substations Civil Works Financial & Accounting Environmental Engineering Electric & Control Systems Financial Administrative Overhead Transmission Lines Civil Engineering Structure

  4. Environmental risk assessment for particulate matter (PM10) Client: SC ArcelorMittal Galati SA Start/Completion Date: 2006 / 2007 Partners: ICEM - Metallurgical Research Institute - Bucharest

  5. Safe Operation of the Malina Technological Ponds Client: Arcelor Mittal Galati SA Start/Completion Date: 2009/2011

  6. Technical Project for Closure and Rehabilitation of Hidrohalda and Soldana II Technological Ponds Client: Arcelor Mittal Galati SA Start/Completion Date: 2008/2009

  7. Security report - Arcelor Mittal Galaţi Client: Arcelor Mittal Galati Start/Completion Date: March 2007

  8. National Programme for Carbon Capture and Storage – CCS Client: Ministry of Economy Trade and the Business Environment Start/Completion Date: 2010/on-going

  9. GETICA CCS Demo Project European CCS Demonstration Project Network member Client: Global CCS Institute - Australia Start/Completion Date: 2010/2011

  10. GETICA CCS Demo Project European CCS Demonstration Project Network member Client: Romanian Government - METBE, Complex Energetic Turceni, Romgaz, Transgaz Start/Completion Date: 2010/2011 (commissioning 2015)

  11. GETICA CCS Demo Project - Technologies Optimization Client: Ministry of Economy, Trade and Business Environment Start/Completion Date: 2011 (on going) /2012

  12. CO2 Transportation Risk Assessment for Carbon Capture and Storage Client: BS-ERA.NET, EC – FP7 Start/Completion Date: 2011 (on going) /2013

  13. CO2RISKMAN Client: DNV – DET NORSKE VERITAS, Norway Start/Completion Date: 2011 (on going) /2012

  14. CCS Regulatory Test Toolkit Client: Global CCS Institute - Australia Start/Completion Date: 2011

  15. Romanian CCS Roadmap Report Client: Bellona Europa Start/Completion Date: 2011

  16. CCS communication impact –”FENCO ERA NET” Client: Ministry of Education and Research Start/Completion Date: January 2009/ January 2010

  17. Social Survey for CCS Public Acceptance Evaluation Client: Ministry of Economy, Trade and the Business Environment Start/Completion Date: October 2011/ March 2012

  18. “Capture-ready” power units implementation – Isalnita CHPP Client: Complex Energetic Craiova (Isalnita CHPP) Start/Completion Date: November 2009/April 2010

  19. “Capture-ready” power units implementation – Rovinari TPP Client: Complex Energetic Rovinari (Rovinari CHPP) Start/Completion Date: August 2009/December 2009

  20. Contact: BUCHAREST Headquarter 1-3 Lacul Tei Blvd. 020371 Bucureşti Romania ph. + 4021 210 10 95 fax. + 4021 210 23 34 email:office@ispe.ro TIMIŞOARA Subsidiary 18-20 Gheorghe Lazăr str. 300081 Timişoara, Timiş district Romania ph.+ 4025 620 03 69 fax. + 4025 649 20 88 email:office@ispetm.ro www.ispe.ro return