M1 Project (West Gate Freeway Section) Background video
Background • The $1.39 billion ‘Monash-Citylink-West Gate’ M1 upgrade is the largest statefunded road project in Victoria’s history. Stretching 75km from Werribee to Narre Warren, it delivers a safe and efficient fourlane freeway that is Melbourne’s transport spine. • The project was split into four main pieces, and the 6.2km West Gate Freeway section through the CBD is relatively short in length. Yet it more than makes up for it in complexity, and an alliance of five groups delivered the project.
Background (cont.) • To call this a brownfield site is a major understatement – the working parameters are tight and the existing roadways carry more than 160,000 vehicles every day. • New bridges, ramps, pillars and pavement contribute to a smoother and smarter traffic flow for the many motorists using this vital link. • Special legislation was created for the project. Schedule 5A was added to the Road Management Act 2004 that included: • Limits of the project • Acquisition of land • Surrender and Divesting of land
‘Surveyors’ are required for all parts of road projects Stages of the project DEVELOPMENT & PLANNING PRE-CONSTRUCTION DESIGN & CONSTRUCTION AS BUILT Ongoing MANAGEMENT Renovate Transportation Corridor
Opening Everything finished ?????
Completion of cadastral and land tenure items • Items that have been completed: • Aerial Photography • Control Survey Plan • Feature surveys • Laser Scanning of structures • Acquisition Survey Plans • Notice of Acquisition gazettals • Plans of Subdivision and creation of easements • Governor in Council gazettals • etc
Scope the remaining items • Complete land status and ownership search was completed. Interesting items: • Stratum titles owned by Roads Corporation • Discontinuations vested in Roads Corporation (titles still exist) • Discontinuations completed under Project Development and Construction Management Act 1994 • Temporary Railway purposes reserves where a Crown Lease has been issued • A title for 1m2 • Cancelled titles that should still exist • Multiple interests in land (and stratum) • Etc
Scope the remaining items (cont) • Summary of actions was created. For example: • Show existing West Gate Freeway declaration • Show the extent of the existing Crown Leases • Field survey to confirm the new structures were located within the acquisition and proposed freeway declaration boundaries • Plans of Subdivision • Plans for Creation of Easement • Defining the surplus land that is no longer required for future road projects • Amending Crown leases to remove the acquired land • Show extent of temporary reserves to be revoked
Progress – Convention Centre • Normanby Road to Montague Street
Progress – Convention Centre • Normanby Road to Montague Street • Pictures of the site • Survey documents/plans produced
Progress – Crown Leases • Clarendon Street to Whiteman Street
Progress – Crown Leases • Clarendon Street to Whiteman Street • Survey documents/plans produced
Expected completion • Late 2012, depending upon the resources allocated