An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ERCOT Update to RMS on IDR Requirement Reports Carl Raish ERCOT Load Profiling April 9, 2008

  2. Mandatory IDR Installation Key excerpt from Protocols Protocols Section 18.6.1, Interval Data Recorder (IDR) Installation and Use in Settlement:

  3. Mandatory IDR Installation RMGRR060, Mandatory IDR Installation Process was approved by TAC on 03/06/08 and will become effective on 04/01/08. Key excerpts:

  4. IDR Requirement Reports

  5. IDR Requirement Reports

  6. IDR Requirement Reports For the 52 ESI IDs referenced on the previous slides, following are demand values (kW or kVA) covering periods after the ESI IDs appeared on IDR Requirement Reports. Shaded cells contain demand values greater than 700.

  7. IDR Requirement Reports continued from previous slide