50 likes | 325 Views
Shriram Foundry Ltd , ( Machine Shop ). DEPT : M/c shop. CONTINUAL IMPROVEMENT SHEET. DATE : 07/09/2013. Approved by :. Prepared by. Shriram Foundry Ltd , ( Machine Shop ) BEFORE. Ø 37.1 SPOT FACE HOLE OBSERVED CHIPS. Shriram Foundry Ltd , ( Machine Shop ) AFTER.
E N D
Shriram Foundry Ltd , ( Machine Shop ) DEPT: M/c shop. CONTINUAL IMPROVEMENT SHEET DATE : 07/09/2013 Approved by : Prepared by
Shriram Foundry Ltd , ( Machine Shop ) BEFORE Ø 37.1 SPOT FACE HOLE OBSERVED CHIPS
Shriram Foundry Ltd , ( Machine Shop ) AFTER Ø 37.1 SPOT FACE HOLE NOT OBSERVED CHIPS / CLEAN CUT/ OPRETOER FATINGUE REDUCED
Shriram Foundry Ltd , ( Machine Shop ) BEFORE Ø SCMT 120412 IC 3 R RADIOUS ON ALL FOUR CORERS.
Shriram Foundry Ltd , ( Machine Shop ) AFTER Ø SCMT 120412 IC 3 R RADIOUS ON TWO OPPOSITE CORERS.