20 likes | 109 Views
Pretest station. Ilia Ravinovich. 01/07/08. I. Ravinovich. 1. Pretest station update. Three stacks have been installed, all three were stable. The first one showed gain increase and high gain Measurements: dV=470V, G=2034 dV=484V, G=3910 dV=497V, G=8165
E N D
Pretest station Ilia Ravinovich 01/07/08 I. Ravinovich 1
Pretest station update • Three stacks have been installed, all three were stable. • The first one showed gain increase and high gain Measurements: dV=470V, G=2034 dV=484V, G=3910 dV=497V, G=8165 dV=511V, G=19090 The second one was stable dV=484V, G=1495 dV=497V, G=3266 dV=511V, G=5980 The second stack shows much less gain than the first one although the GEMs from he same 2007 production. 01/07/08 I. Ravinovich 2