1 / 17

RBM Plans in Slovakia Actual state of PaM

RBM Plans in Slovakia Actual state of PaM. Emília Kuníková , VUVH. Content. River basin management plans in Slovakia Structure of RBMPs Development of plans and International cooperation Main findings Status of surface WBs Program of Measures

dyllis
Download Presentation

RBM Plans in Slovakia Actual state of PaM

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. RBM Plans in SlovakiaActual state of PaM Emília Kuníková, VUVH Košice, 18th May 2010

  2. Content • River basin management plans in Slovakia • Structure of RBMPs • Development of plans and International cooperation • Main findings • Status of surface WBs • Program of Measures • Exemptions from environmental objectives up to 2015 • Realisation of Programme of Measures • Next steps Košice, 18th May 2010

  3. River Basin Management Plans in SK International level • Danube River Basin District Management Plan – A level • Integrated Tisza River Basin management Plan – B level National level • Water management Plan for Slovakia (VodnýPlánSlovenska)– Approved by Government in Febr.2010– B level • Danube River Basin District Plan • Vistula River Basin District Plan • River Basin management Plans for sub-units – approved by MoE - C level : • 4a/ Bodrog including Tisza • 4b/ Hornád • 4c/ Bodva • 4d/ Slaná Košice, 18th May 2010

  4. Structure of nationalPlans The national plans cover WFD issues • Introduction • River Basin District (sub-unit) characterisation • Register of protected areas • Identification of significant pressures • Monitoring, status of waters • Environmental objectives • Economic analyses • Program of Measures • Gaps and uncertainties • Protection against extreme effects of waters, climate changes • Register of more detailed plans and programmes • Public information and communication • List of competent authorities Košice, 18th May 2010

  5. Plans development and international cooperation • National level • Strategy for WFD Implementation - working groups • Main institution involved – VUVH, SHMU, SVP • WG – experts from various institution • International level • ICPDR • Bilateral SK/HU WG for the WFD implementation (last bilateral meeting 2-3 February 2010) Košice, 18th May 2010

  6. Main findings – surface WBs statusSlovak part of Tisza basin • Ecological status /potential • Chemical status Košice, 18th May 2010

  7. Program of Measures – for SWMI • Organic pollution • Polution by nutrients • Polution by Hazardous substances • Hydromorfological changes • Pollution of grondwaters • Quantitative status of groundwater Košice, 18th May 2010

  8. PaM – Organic pollution • Basic measures – implementation of UWWTD, IPPC, Sewage Sludge D • Supplementary measures – developments of WW collection and treatment in small agglomeration • Legislation, Education, Košice, 18th May 2010

  9. PaM – Nutrient pollution • Basic measures – implementation of UWWTD, IPPC, Nitrate Directive • Supplementary measures – developments of WW collection and treatment in small agglomerations • Application of Codex of good practices • Legislation including phosphate free detergents, Education Košice, 18th May 2010

  10. PaM – Hazardous substances • Legislation • Permits revisions • Programme for Pollution by Hazardous substances Košice, 18th May 2010

  11. PaM – Hydromorphological changes • Improving longitudinal connectivity of rivers and biotopos – fish passes, biocoridors • Improving lateral connectivity of rivers with inundation areas – connecting of dead arms with rivers • Fish monitoring Košice, 18th May 2010

  12. PaM – groundwater • Basic measures • Pollution • Decontaminationof polluted areas • Legislation • Methodologies for Groundwater Directive into practise • Water level • Revision of permits • Supplementary measures • Methodologies, studies Košice, 18th May 2010

  13. Exemptions from objectives up to 2015 SurfaceWBs - ecological status Košice, 18th May 2010

  14. Exemptions from objectives up to 2015- Groundwater WBs – chemical status • Exemptions art. 4(4) WFD – for 4 WBs – chemical status Košice, 18th May 2010

  15. Realisation of PaM • Basic measures – timescale acording to obtained transitional periods • Other basic measures – Hymo measures and decontamination of polluted localities – gradually up to 2025 • Supplementary measures – WW collection and treatment in small agglomerations - gradually up to 2025 Košice, 18th May 2010

  16. Next steps • Strategy of WFD implementation for 2.cycle including FD and water quantity issues – MoE • 2012 – progress report to EC on PandM realisation Košice, 18th May 2010

  17. Availability of plans • http:/www.vuvh.sk/rsv2/ Košice, 18th May 2010

More Related