SOP Progress • 78 SOP’s have been identified • 13 have been approved and posted • 38 have been reviewed, awaiting approval • 7 need edits incorporated • 27 need to be produced
Awaiting Approval • 37 Documents • Posted for review • http://nadp.isws.illinois.edu/dl/QAAG/For_Review/SOPs/ • HAL and CAL have reviewed these documents • Looking for approval of all 37 documents • OR • We could approve each one individually
Motion to Approve Documents • The documents listed above are accepted and approved for network use. These documents will supersede previous versions of the documents.
First 10 of 37 • ACM_Troubleshooting_Guide_v_1-2.docxAIRMoN_Field_Blank_v_1-0.docAIRMoN_pH_conductivity_v_1-0.docAMNet_Site_Performance_and_Systems_Survey_v1-1.docbattery_load_test_v_1-2.docBelfort_Summerization_v_1-2.docBelfort_Troubleshooting_Guide_v_1-1.docxBelfort_Winterization_v_1-2.docEgage_data_download_and_transfer_flash_drive_v_1-3.docpendingEgage_emptying collection_chamber_v_1-1.doc
11 – 20 of 27 • ER_Troubleshooting_ACM-Belfort_v_1-1.docpendingER_Troubleshooting_ACM-NoahIV_v_1-1.docpendingER_Troubleshooting_ACM-OTT_v_1-1.docpendingER_Troubleshooting_NCON-NoahIV_v_1-1.docpendingER_Troubleshooting_NCON-OTT_v_1-1.docpendingMDN_Motorbox_Replacement_NCON_v_1-5.docMDN_Sample_Changeout_ACM_v_1-4.docMDN_Sample_Changeout_NCON_v_1-4.docpendingMDN_Summerization_ACM_v_1-2.docMDN_Summerization_NCON_v_1-2.doc
21 – 30 of 37 • MDN_Winterization_ACM_v_1-3.docMDN_Winterization_NCON_v_1-2.docN-CON_adusting_lid_v_1-0.docN-CON_troubleshooting_Guide_v_1-1.docxNOAH-IV_Summerization_v_1-1.docNOAH-IV_Winterization_v_1-1.docNTN_ACM_lid_change-out_v_1-1.docxNTN_bag_sampling_2012_01_v1_13.docxNTN_Grid_Sensor_Replacement_ACM_v_1-2.docNTN_Motorbox_Replacement_ACM_v_1-4.doc
31 – 37 of 37 • NTN_N-CON_lid_change-out_v_1-0.docxNTN_Sample_Changeout_ACM_v_1-1.docNTN_Sample_Changeout_NCON_v_1-9.docNTN_Sample_Decanting_v_1-0.docNTN_Thies_Sensor_Replacement_NCON_v_1-0.docPluvio2_Summerization_v_1-1.docPluvio2_Winterization_v_1-1.doc
Individual Motions • Return to slide #5 and read the following statement for each document • The document listed is accepted and approved for network use. The document will supersede previous versions of the document • Vote on each listed in slide #5, 6, 7 and 8