1 / 15

KEYS TO A SUCCESSFUL FAST-TRACK ADVANCED PROCESS CONTROL PROJECT

KEYS TO A SUCCESSFUL FAST-TRACK ADVANCED PROCESS CONTROL PROJECT. Celanese Chemical Company. KEYS TO A SUCCESSFUL FAST-TRACK ADVANCED PROCESS CONTROL PROJECT. Agenda Introduction Celanese Background Keys to Successful Fast-Track APC Project

Download Presentation

KEYS TO A SUCCESSFUL FAST-TRACK ADVANCED PROCESS CONTROL PROJECT

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. KEYS TO A SUCCESSFUL FAST-TRACK ADVANCED PROCESS CONTROL PROJECT Celanese Chemical Company

  2. KEYS TO A SUCCESSFUL FAST-TRACK ADVANCED PROCESS CONTROL PROJECT Agenda • Introduction • Celanese Background • Keys to Successful Fast-Track APC Project • Objectives, Strategies, and Benefits of the Three Celanese APC Projects • Questions

  3. INTRODUCTION • Pat Benavides - Celanese Chemical Company - Controls Group Section Leader • L.K. Lui - Celanese Chemical Company - Controls Engineer • Brian Alexander - Invensys Performance Solutions - APC Consulting Engineer

  4. CELANESE BACKGROUND • Who We Are • Why Fast-Track Schedule - Maximize Profits! • APC Scope Description

  5. CELANESE - WHO WE ARE • Global Leader in Chemical Industry • Founded 1999 from Hoechst AG • 30 production sites in 11 countries in USA, Europe, and Asia • Products include chemical commodities and specialties, engineering polymers, plastic films and food ingredients

  6. WHY FAST-TRACK SCHEDULE - MAXIMIZE PROFITS! • Take advantage of market pricing fluctuations • Goal of ? Months for completion

  7. APC SCOPE DESCRIPTION • Competitive bids included Invensys Performance Solutions • Celanese chose Invensys Performance Solutions • Three (3) APC projects initiated in 2001 • Two (2) APC projects on Honeywell DCS • One (1) APC project on Foxboro I/A

  8. KEYS TO A SUCCESSFUL FAST-TRACK APC PROJECT • Project Justification • APC Consultant Selection • Cooperation • Efficient APC Project Execution • Training

  9. PROJECT JUSTIFICATION • Contract this work to an outside consultant: quicker and easier justification • Steps for Justifying APC Project • Identify Market Opportunity • Gather and Measure Process Data • Evaluate Process Data • Calculate Benefits • Determine APC Project Costs • Communicate Benefits to Management

  10. APC CONSULTANT SELECTION • Experience • Methodology • Flexibility • Cost • Schedule • DCS Independent

  11. COOPERATION • Open Transfer of Information • Process Information to Consultant • APC and Control Information and Expertise to Celanese • Determine Control Objectives and Strategy • Experience - Process and APC • Receptive to Control Scheme Changes

  12. EFFICIENT APC PROJECT EXECUTION • Experience • minimizes rework; step testing done once • quick DCS mods and instrument repairs • APC consultant is efficient with software tools • Process Knowledge • Involvement of process engineers important • design done only once • dedicated operations support

  13. OBJECTIVES OF THREE APC PROJECTS AT CELANESE • OBJECTIVES • Maximize Production Rates • Improve Product Yields • Improved Catalyst Life • Control Product Quality, Reduced Rerun • Reduce required operator interaction • Maintain the Unit Within Capacity, Temperature, and Flammability Constraints

  14. APC PROJECT CONTROL STRATEGIES • APC to manipulate major process variables • All major controlled variables included • Highly interactive processes - single APC controller per unit

  15. CELANESE APC PROJECT BENEFITS • Maximized feed of one unit by ?% - $? savings • Reduced product venting - $?M savings • Increased product yield - $?M savings • Reduced energy consumption - $?M savings • Minimized reactor shutdowns - $?M savings

More Related