Emrah T. SAK March 2013 European RequalificationSystem
Today’s Outline • Brief Information AboutEVAS • PeriodicInspection in Europe • General Information AboutRelated EN Standards • RefurbishmentProcess
ABOUT EVAS • Thefirst LPG cylindermanufacturer of Turkey. • One of the biggest LPG cylinderproducers in Europe. • SHVENERGYcompany • Annuallyaround 2 million cylindersproduction. • Annuallyaround600.000 cylindersrefurbishment. • Active in 5 Continets, 49 Countriesallaroundthe World
ABOUT EVAS İstanbul-New Cylinder Manufacturing Ankara-Refurbishment İzmir-Refurbishment
Today’s Outline • Brief Information AboutEVAS • PeriodicInspection in Europe
Periodic Inspection Period Working life of cylinder? There is nocalculated life spanfor LPG cylinders
Periodic Inspection Period • Average life span of cylinders: • InWest Europe 41 years • InTurkey 32 years • InUAE (officially )15 years • InMalesia 11 years Malesia-Cylinder Distribution
EVAS Refurbishment Factories-2012 Number of received cylinders in 2012: 550.000 units Testing without repair: 87.000 units Testing with repair: 326.000 units Scrap: 137.000 units
PRESTAGAZ Statistics-2012 Luxembourgish Company Number of received cylinders in 2012: 680.000 units from 5 countries
Comparison of Turkish and European Data 66% 11% 32 years 41 years 6 times 4 times
Periodic Inspection Period in Europe • NormallyforallcylindersPeriodicInspection Period is 10years. • It can be extendedto15yearsiffollowingsarefulfilled: • Cylinder is be owned by and under the responsibility for checking, filling and maintenance of acompetent gas organisation
Periodic Inspection Period in Europe 11 kg GermandepositCylinder 15 YearsPeriodicInspection 11 kg GermanNutzungCylinder 10 YearsPeriodicInspection
Periodic Inspection Period in Europe • NormallyforallcylindersPeriodicInspection Period is 10years. • It can be extendedto15yearsiffollowingsarefulfilled: • Cylinder is be owned by and under the responsibility for checking, filling and maintenance of acompetent gas organisation • there must be an external protection against corrosion • Cylinder should be filled in accordance withEN 1439
Today’s Outline • Brief Information AboutEVAS • PeriodicInspectionin Europe • General Information AboutRelated EN Standards
European Norms EN 1439 - LPG equipment and accessories. Procedure for checking LPG cylinders before, during and after filling EN 1440 - LPG equipment and accessories. Periodic inspection of transportable refillable LPG cylinders EN 14912 - LPG equipment and accessories - Inspection and maintenanceof LPG cylinder valves at time of periodic inspection of cylinders
EN 1439 SCOPE Covers the control operations applied on transportable, refillable LPG cyliders before, during and after filling. EN 1439
EN 1440 SCOPE Covers the periodic inspection and tests on transportable, refillable LPG cylinders. Periodic inspections/tests shall be carried out by a competent person under the control of aninspection body based on a written scheme and in accordance with the procedures. It also consists general frame of repair and it is requirements.
Today’s Outline • Brief Information AboutEVAS • PeriodicInspection in Europe • General Information AboutRelated EN Standards • RefurbishmentProcess
Refurbishment Before-After
Refurbishment De-Gasing & Valve Removing EX-ZONE Detection of liquid gas2 Gamma radiation sources which detect up to 400 gr gas left in the cylinders. Drain and gas recoveryEmptying bottles and recovering the gas-in the gas phase or liquid.The recovered gas is stored and re-used. No atmospheric emissions! Valve removing All valves removed are stored and inspected later according EN14912 standard or as per customer specs
Refurbishment Washing & Visual Inspection Visual Inspection Then cylinders are visually inspected and separated either for repairing or scraping, or conform ones, send to the finishing hall. Inspection is realized by qualified and trained personnel. Internal WashingEvery cylinder is internaly washed in automatic carousel
Refurbishment Washing & Visual Inspection Straighten of Foot-Ring and/or Collar Changing of Foot-ring or Valve Guard Separated Damaged Cylinder
Refurbishment De-Denting Blowing Damaged cylinders are de-dented by means of pressured air and heating of dent zone.
Refurbishment Heat Treatment (stress relieving) at 600-630 oC Hydrostatic Testing Shot Blasting
Refurbishment Finishing Zinc Coating • Recording • Retest date, • Manufacture date • Manufacturer’s name Painting
Refurbishment Finishing Inkjet Marking Printing all information regarding tare weight, test date and next retest date on the cylinders. It allows much more legibility and visibility of all essential information. Valve Fitting Leakage Test
Refurbishment Before-After
No Repairable Cylinders Bulge Depresed Bung Lamination Cut (which exceeds min. thickness) Depresed Shroud or Foot-ring
Refurbishment Scrapping Smashed Cylinders