An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. EUROPEAN TERRITORIAL MONITORING SYSTEM Project Status Oriol Biosca (MCRIT) TPG Meeting in Prague 5-7 March 2014 http://81.47.175.201/etms-project/

  2. Conceptual Approach: thepolicydimension ETMS and Territorial Agenda (and CSF, ESIF…) ETMS and EU2020

  3. Conceptual Approach: thegeograpicdimension

  4. Conceptual Approach: thegeograpicdimension

  5. Conceptual Approach: thegeograpicdimension

  6. Conceptual Approach: the ETMS products

  7. ESPON CU FeedBack: synthesis 1/2 • Elements to be included in the ETMS • Soft Factors and Attractiveness? • Green infrastructures? • Business sector (private R&D, labour productivity GVA, FDI, SME)? • Perception surveys (Eurobarometer)? • Blue growth (ports)? • 2. Territorial targets from ESPON Scenarios • 3. Delineations • ESPON Typologies (KIT, SEGI, climate change)? • neighborhood, other cities, TNC, macro-regions, national, EU average) • 4. Interaction with other ESPON Tools • Interaction with RIMAP • Interaction with other tools: cityBench, BSR-TEMO • (advanced analysis on correlations)

  8. ESPON CU FeedBack: synthesis 2/2 • 5. Web platform. • Central element of the platform is the EU2020S • Focus more explicitly on the visualization of indicators • 6. F&F • No thematic orientation of the publication • To give an overview of the 5 themes at different geographic scales • Present changing development trends on different scales • References: CoR, EUROSTAT, PRR by Eurocontrol • New short term draft required • 7. State of the Territory • Storyline based on the analysis of the policy dimension • References: Nordregio, EEA • New short term draft required • 8. Interaction with ESPON MC • To discuss proposal on F&F and State of the Territory reports (June’14) • No need to discuss indicator choices (as we are based on INTERCO)

  9. Elements to be discussed in Prague • Incorporation of additional indicators • Territorial delineations and typologies • Interaction of DataAnlysis tool with RIMAP • Interaction of ETMS with BSR-TEMO // CityBench • F&F state of the territory approaches • Sustainability issues and ESPON software • Schedule of Activities • Any Others?

  10. Schedule of Activities – Short Term • F&F structure and layout draft sent to ESPON  30 March 2014, Nordregio • State of the Territory structure and layout draft sent to ESPON  30 March 2014, UNIGE/S4S • Translation keys between NUTS 2006 and NUTS2010 • Finalisation of Data Collection issues  •  end of March 2014. UNIGE + Nordregio + UAB + MCRIT • Database documentation (typology and field codes) • Aggregation rules NUTS3 to NUTS2 to NUTS1  two weeks • Specification entry points and filters of aggregation of indicators  end of March 2014. GISAT • Draft v1.0 of the Tool  Mid april. It may incorporate the substraction of cities from territorial specificities regions. • Version 2.0 of the Homepage.  15th April 2014. MCRIT • Skype meeting  around 15 April 2014

  11. Schedule of Activities – Longer Term (temptative) • 1st draft of State of the Territory  15 May 2014 (UNIGE/S4S) • 1st draft of F&F  15 May 2014 (Nordregio) • Reports to be discussed with ESPON CU, and presented to ESPON MC • (open seminar, early June 2014 in Greece) • Other stakeholder involvement? • Draft Web portal (15 May 2014, MCRIT) • Draft Analysis Tool (15 May 2014, GISAT) • Internal test of tools (1 June 2014, UAB) • Sustainability reports (15 June 2014, UAB) • Long-term Recommendations (15 June 2014, UNIGE) • DFR (30 June, MCRIT + All) with working tools  eventual delivery extension to Sep’14?

  12. AdministrativeIssues • Progress Report 1 • Funding received from ESPON CU and transferred to partners • Progress Report 2 • Last partner input expected in the short term • Progress Report 3 • Covers for period October 2013-March 2014 • Documentation will be sent to partners in the short term • Audited report to be sent to MCRIT by 30 May 2014 • Audited PR3 to be sent to ESPON by 30 July 2014

  13. EUROPEAN TERRITORIAL MONITORING SYSTEM Project Status Oriol Biosca (MCRIT) TPG Meeting in Prague 5-7 March 2014 http://81.47.175.201/etms-project/