Laser-wire at the ATF extraction line

Laser-wire at the ATF extraction line. Laser Based Beam Diagnostic (Laser-wire UK collaboration) RHUL/UCL/OXFORD. e-beam Line. Focusing, Scanning, Diagnostics. Laser. Diagnostics. Pre-IP. Post-IP. Relay optics. Laserwire Experiment. Relay Optics

eagan
Download Presentation

Laser-wire at the ATF extraction line

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Laser-wire at the ATF extraction line Laser Based Beam Diagnostic (Laser-wire UK collaboration) RHUL/UCL/OXFORD

  2. e-beam Line Focusing, Scanning, Diagnostics Laser Diagnostics Pre-IP Post-IP Relay optics Laserwire Experiment • Relay Optics • Focusing, Scanning & Pre-IP Diagnostics (Focus imaging, etc) • Post-IP Diagnostics ATF meeting, 9th Match 2005

  3. Laser Hut Infrastructure - Use the laser - Use the Metric table for additional optics: relay optics; pre-IP diagnostics (Photodiode, powermeter etc) - Install our electronics (scanner driver etc) Optics Transport: (e-Polarization Experiment) Basic infrastructure is already there (rack, table, ATF signals,…) ATF meeting, 9th Match 2005

  4. Ext. Line Infrastructure Extraction Line Use what’s already there: - Some vacuum chambers - Most of the safety piping - Supports, tables, mirrors - BPMs, Wire scanner, OTR ATF meeting, 9th Match 2005

  5. Needs to be changed What needed & what’s needed to be changed? Modify the beam path ATF meeting, 9th Match 2005

  6. Diagnostics Wire Scanner OTR IP e-beam Focusing Optics Setup needed Laser 1m x 1m

  7. Items required - Support for the Optics Transport : - Pipes for the optics table - Table position not yet decided ? - Two Breadboards: 1- 1500 mm x 1000 mm (Pre-IP location) 2- 1000 mm x 750 mm (Post-IP location) - Box to enclose system - Electron-beam diagnostics - Wirescanner - Wire 2 m ? - Translation stage resolution - 2 BPMs - Screens - Beam Optics - Laser Hut - Laser hut access - Electronics rack: use existing trigger for laser - ATF control: BPMs; correctors; magnets; DR ramp ATF meeting, 9th Match 2005

  8. Schedule • May/June 2005:Install the laser transport and delivery (Optics, Scanning,…), laser measurements, validate DAQ • September 2005:Install our vacuum vessel at the ATF and final focusing lens • November/December 2005:Laser-wire run