1 / 9

Advancing Ministry Opportunities Architectural Presentation

Advancing Ministry Opportunities Architectural Presentation. 2007 MASTERPLAN. EXPANSION TO THE EXISTING BUILDING. ATTIC STORAGE. ATTIC STORAGE AND MECHANICAL SYSTEMS. FUTURE EXPANSION NEXT PHASE BUILDINGS.

ebony
Download Presentation

Advancing Ministry Opportunities Architectural Presentation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Advancing Ministry • Opportunities • Architectural Presentation

  2. 2007 MASTERPLAN

  3. EXPANSION TO THE EXISTING BUILDING

  4. ATTIC STORAGE

  5. ATTIC STORAGE AND MECHANICAL SYSTEMS

  6. FUTURE EXPANSION NEXT PHASE BUILDINGS

  7. TOTAL ESTIMATED PROJECT COST INCLUDING THE BUILDING, SITEWORK, AUDIO VISUAL, FURNISHINGS AND FEES FOR THE 5,800 SF PLAN - $993,000.00 ANTICIPATED DESIGN AND CONSTRUCTION SCHEDULE: DESIGN, ZONING AND DRB APPROVAL- OCTOBER 2013-FEBRUARY 2014 PERMITTING – MARCH 2014 CONSTRUCTION – APRIL 2014-FEBRUARY 2015 SCHEDULE AND PROJECT COST

More Related