1 / 4

NERC Compliance Process Directive #2011-CAG-001 Directive Regarding Generator Transmission Leads

NERC Compliance Process Directive #2011-CAG-001 Directive Regarding Generator Transmission Leads. Attachment 1 Typical Generator Transmission Leads One-Line Diagrams. Glossary of Icons. Breaker. Bus. Generation Lead. Generator. Integrated System Line. Disconnect. GSU Transformer.

Download Presentation

NERC Compliance Process Directive #2011-CAG-001 Directive Regarding Generator Transmission Leads

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NERC Compliance Process Directive #2011-CAG-001 Directive Regarding Generator Transmission Leads Attachment 1 Typical Generator Transmission Leads One-Line Diagrams

  2. Glossary of Icons Breaker Bus Generation Lead Generator Integrated System Line Disconnect GSU Transformer

  3. Single Generator Transmission Lead1a To Sub 2 To Sub 1 Integrated System Line Interconnection TO/TOP Responsibility Point of Interconnection 1. > 3 Towers + Adjacent spans GO/GOP Entity Registered as a TO/TOP Area of Responsibility Conditions of GO/GOP Entity with Single Generator Transmission Leads to be registered as a TO/TOP Long lead lines or Blackstart or Considered ‘major transmission’ by RE Transformer High Side 2. GO/GOP Blackstart Transformer Low Side NOTE: This is a generic representation. The internal components may increase or decrease. The TO/TOP Area of Responsibility may expand or contract based on specific facts and circumstances, and ownership. Registered GO/GOP

  4. Multiple Generator Transmission Leads2a To Sub 1 To Sub 2 Interconnection TO/TOP Responsibility Integrated System Line GO/GOP Entity Registered as a TO/TOP Area of Responsibility (Typical) Point of Interconnection 1. > 3 Towers + Adjacent spans Conditions of GO/GOP Entity with Single Generator Transmission Leads (feeding a bus) to be registered as a TO/TOP Long lead lines or Blackstart or Considered ‘major transmission’ by RE GO/GOP 2 would be registered as a TO/TOP responsible for the bus to Point of Interconnection tie line. NOTE: This is a generic representation. The internal components may increase or decrease. The TO/TOP Area of Responsibility may expand or contract based on specific facts and circumstances, and ownership. 2. GO/GOP Blackstart 2. GO/GOP Blackstart Registered GO/GOP 1 Registered GO/GOP 2 Registered GO/GOP 3