2. PROFESSOR POTHOLEPRESENTS Bureau of Street Services Programs
for the
Federation of Neighborhood Councils
3. Street Resurfacing and Reconstruction Division Maintains 7,200 miles of streets and alleys.
Operates two asphalt plants.
Contracts with an recycled asphalt producer.
4. Street Maintenance Division Cleaning of improved streets and alleys – 13,085 curb miles.
Temporary repairs to streets and sidewalks
Provides maintenance to over 3,000 trash receptacles.
5. Street Tree Division Custodian of 680,000 trees in the Urban Forest.
Maintain 295 acres of landscaped medians.
Over 1,000 different species of trees.
6. Lot Cleaning Division Enforces the Annual Weed Abatement Ordinances of 20,000 lots/year.
Clear weed growth, illegally dumped debris from improved and unimproved public streets and alleys (145,244 cubic yards - YTD).
7. Special Project Division Permanent sidewalk repair.
Neighborhood improvement projects.
Access Ramps
8. Engineering Division Design/Build Program
Designs streetscapes
Street Furniture Program
9. Street Use Inspection Division Regulates the use of the public right-of-way
Street Banner Program
Illegal Dumping Surveillance
10. Fiscal Management Division Budget Preparation
Purchasing
Payroll
All fiscal matters
11. THE STREET SYSTEM
12. Current Condition Assessment 6,500 mile street system
Approximately 1,000 miles of failed streets
Overall system condition is a C-
13. How Did We Get In This Mess?
14. HOW DO WE FIX THIS MESS?
15. 10 Year Plan Maintenance
Slurry Seal
Crack Seal
Pothole Repairs
Rehabilitation
Blankets
Resurfacing
Reconstruction
17. ANNUAL RESURFACING PROGRAM
18. Budget Allocation Formula
Total Maintained
Centerline Miles in CD
Council District = x 100%
Allocation Total Maintained
Centerline Miles Citywide
19. How Are Streets Selected? Street selection for the Annual Resurfacing Program is based on the Bureau’s Pavement Management System:
Defines the existing condition of streets.
Determines the most economical maintenance and rehabilitation strategy.
Predicts future condition of the street network based on different budget scenarios.
20. Utility Clearances The ARP is submitted for clearance to over 200 utility companies 15 months in advance to comply with the Street Damage Restoration Fee Ordinance (SDRF), usually in April.
An annual meeting is held to answer questions and responses are requested by June.
Projects showing a “Hold” status are substituted and re-submitted for clearances.
If a year’s notice is not provided to the utility companies, a special clearance is requested but then, utility companies are entitled to put projects on hold as described in the SDRF Ordinance.
21. Funding Sources2002-2003 Annual Resurfacing Program Major/Proposition “C” $11,000,000
Major/TCRP 11,700,000
Major/Gas Tax 700,000
Local/Gas Tax 16,700,000
Local/Traffic Safety 5,000,000
Local/General Fund 11,700,000
Dirt Streets/General Fund 2,281,000
22. Why Don’t We Fix The Worst Streets First? 80/20 Allocation Plan
80% Blankets/Resurfacing
20% Reconstruction
Spending more in reconstruction or using a “worst first” strategy would greatly reduce the number of streets resurfaced and cause an acceleration in the decline of the overall condition of the street system.
30. SIDEWALK REPAIR PROGRAM
31. Historical Look At The City’s Sidewalk Policy
32. Historical Between 1978 to 2000, no full scale permanent sidewalk repair program existed in the City. In the interest of public safety, the Bureau made repairs with asphalt at no direct cost to the property owner.
For the first time in 25 years, a budget was approved in the 2000-2001 budget for approximately $9 million to permanently repair 46 miles of the most damaged sidewalks.
In 2001-2002, the Sidewalk Repair Program was again funded and increased to repair an additional 98 miles of sidewalks
Fiscal Year 2002-2003, the Mayor and City Council increased the program by 20 miles to a total of 118 miles.
33. Criteria For Sidewalk Repair Areas where slip, trip and fall accidents have occurred.
Where tree roots have raised the sidewalks within American with Disabilities Act “transition areas”, as determined by the Department of Disability.
Where paths of travel issues exist in conjunction with access ramp construction.
In low and moderate income census tract areas.
34. Sidewalk Repair Options Grind Sidewalks
Meander Sidewalks
Enlarged Tree Well
Reduce Sidewalk Width Rubberized Pavers
Pour-in-Place Rubberized Sidewalk
Sidewalk Ramping
42. STREET TREE PROGRAM
43. Program Objectives To provide a safe, acceptable walking surface for pedestrians.
To decrease the City’s exposure to liability.
To maintain a healthy, safe and sustainable urban forest.
45. How Will The Bureau Accomplish This? City Forces
Contract Forces
Collaborating with Non-profits
Community Groups
46. Number of Trees Planted There are approximately 16,500 new trees planted yearly:
6,000 trees planted by City Forces.
5,000 trees planted by non-profit groups.
4,000 trees planted by developers as part of conditions of the development.
Contract forces plant 1,000.
Private residents plant are issued permits to plant 500 trees.
47. Trees Planted by City Forces Of the 6,000 trees planted by City Forces, most can be categorized in 1 of 4 categories:
Replacement - Trees that have failed or died.
In-planting – Planting new trees where it is anticipated that over-mature trees will require replacement in the near future.
Beautification Projects – Median Islands, and parkways that have never been planted.
Block planting as a component of the Sidewalk Repair Program.
48. Tree Trimming Trimming cycle of 5.8 years
Vehicle and pedestrian clearance
Hazard trees
Clear obstacle signs
49. Tree Removal Tree stripping
Dead trees
Structurally unsound trees
Partially uprooted trees
Stump Removal