1 / 12

EILAND ZWIJNAARDE Development of a regional and green business park at the entrance of Ghent ’

EILAND ZWIJNAARDE Development of a regional and green business park at the entrance of Ghent ’. Mathias De Clercq // City of Ghent // Senior Deputy-Mayor // Vice-Mayor for Economy, Youth and Independent Professions. STRATEGIC LOCATION - 1.

eddy
Download Presentation

EILAND ZWIJNAARDE Development of a regional and green business park at the entrance of Ghent ’

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. EILAND ZWIJNAARDE Development of a regional and green business parkat the entrance of Ghent ’ Mathias De Clercq // City of Ghent // Senior Deputy-Mayor // Vice-Mayor for Economy, Youth and Independent Professions

  2. STRATEGIC LOCATION - 1 • Situated in the southern ‘knowledge cluster’ of Ghent • At the crossroads of 2 European motorways (E40, E17) • Direct access to the City Ring (R4) Coca-Cola Hundelgemsesteenweg Arteveldestadion Heerweg-Noord Domo R4

  3. STRATEGIC LOCATION - 2 • Easy hinterland connections over water, guaranteed in all directions • At the crossroads of 2 main canals for waterway transport (Ringvaart and Scheldt canal)

  4. GREEN BUSINESS PARK • Netto 35ha • Logistics • Research • Green and sustainable business park • Direct access to R4 and Scheldt canal R4 E40 Research Logistics

  5. IMAGES

  6. HIGH QUALITY • Quality in the design of the public space • Quality in the use of construction materials • Open space concentrated in the public space • Business Park Management • Sustainability Scan for all new companies • BREEAM-certificate (Communities)

  7. TIMING • 2011: Technical design • 2012: Construction riverbank strip • 2012: First appeal • 2013: Completion of the elevation • 2013: Construction of the road network and public utilities mains • 2014: Achievement of the connection of the R4 ring road • 2014: Start construction buildings and opening business park

  8. PROJECTPARTNERS • City of Ghent • Urban Development Company (AG SOB) • Province East Flanders • Provincial Development Company (POM) • Alinso nv (Domo Group) • Waterways and Sea Canal nv (W&Z)

  9. INFO Eiland Zwijnaardewww.eilandzwijnaarde.be

More Related