ENERGY DEPOSITION IN HYBRID NbTi/Nb 3 Sn TRIPLET CONFIGURATIONS OF THE LHC PHASE I UPGRADE

Fermilab. Accelerator Physics Center. ENERGY DEPOSITION IN HYBRID NbTi/Nb 3 Sn TRIPLET CONFIGURATIONS OF THE LHC PHASE I UPGRADE. Nikolai Mokhov, Fermilab. CERN March 31 – April 2, 2008. OUTLINE. Introduction Three Upgrade Configurations Studied MARS15 IR and Quad Models

efrem
Download Presentation

ENERGY DEPOSITION IN HYBRID NbTi/Nb 3 Sn TRIPLET CONFIGURATIONS OF THE LHC PHASE I UPGRADE

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Fermilab Accelerator Physics Center ENERGY DEPOSITION IN HYBRIDNbTi/Nb3Sn TRIPLET CONFIGURATIONSOF THE LHC PHASE I UPGRADE Nikolai Mokhov, Fermilab CERN March 31 – April 2, 2008

  2. OUTLINE • Introduction • Three Upgrade Configurations Studied • MARS15 IR and Quad Models • Power Density Maps • Peaks w.r.t. Design Limits • Heat Loads • Summary Energy Deposition in Hybrid IR Phase I Upgrade - N. Mokhov

  3. INTRODUCTION • JIRS project of the LARP aims at investigation of potential of replacing one (on each side of IP) of the NbTi quadrupoles with a Nb3Sn one in the LHC Phase I upgrade of high-luminosity IRs. Based on realistic energy deposition calculations, we are trying to derive operational margins for the quads in various configurations. Preliminary results are presented here. • Simulations are done with MARS15 (2008), and DPMJET-3 as an event generator for 7x7 TeV pp-collisions at 2.5x1034 cm-2 s-1, using low-betamax and symmetric optics from John Johnstone. • IP5 (R) is considered, with a full crossing angle of 450 mrad, segmented absorbers SS or W (possibly) cooled at LN2-temperature, as proposed in our paper PRSTAB, 9, 10001 (2006) and Proc. WAMDO06 Workshop, CARE-Conf-06-049-HHH, p. 80 (2006). Energy Deposition in Hybrid IR Phase I Upgrade - N. Mokhov

  4. 1. LOW-BETAMAX OPTICS: LBM-1 in MARS15 Q1: 90-mm NbTi, 167.2 T/m, L=7.06 m Q2: 130-mm NbTi, 121.4 T/m, L=7.787m x 2 Q3: 110-mm Nb3Sn, 176.2 T/m, L=3m x 2 • TAS aperture: • 42 mm • 55 mm • 3-mm segment absorbers: • W in Q1, SS in Q2, no in Q3 Energy Deposition in Hybrid IR Phase I Upgrade - N. Mokhov

  5. 2. LOW-BETAMAX OPTICS: LBM-2 in MARS15 Q1: 90-mm Nb3Sn, 206.1 T/m, L=5.65 m Q2: 130-mm NbTi, 121.1 T/m, L=7.787m x 2 Q3: 130-mm NbTi, 121.1 T/m, L=8.711 m TAS aperture: 55 mm 3-mm segment absorbers: SS in Q1, Q2 & Q3 Energy Deposition in Hybrid IR Phase I Upgrade - N. Mokhov

  6. 3. SYMMETRIC OPTICS: SYM-1 in MARS15 Q1: 90-mm Nb3Sn, 203.8 T/m, L=2.75m x 2 Q2: 130-mm NbTi, 121.9 T/m, L=7.8m x 2 Q3: 130-mm NbTi, 121.9 T/m, L=9.2 m TAS aperture: 55 mm 3-mm segment absorbers: SS in Q1, Q2 & Q3 Energy Deposition in Hybrid IR Phase I Upgrade - N. Mokhov

  7. 90, 110 and 130-mm Quad Design By Vadim Kashikhin 110-mm 90-mm 130-mm OPERA-calculated 2-D magnetic maps: 200, 180 and 125 T/m, Dx = Dy = 2 mm Energy Deposition in Hybrid IR Phase I Upgrade - N. Mokhov

  8. MARS15 IMPLEMENTATION 90-mm Nb3Sn 130-mm NbTi Same scale Energy Deposition in Hybrid IR Phase I Upgrade - N. Mokhov

  9. Beam screens, segment absorbers, cold bore, kapton,LHE, coils, collar, yoke and cryostat in MARS15 90-mm Nb3Sn 130-mm NbTi Same scale Cryostat: thermal shield and vessel (R=457 mm) Energy Deposition in Hybrid IR Phase I Upgrade - N. Mokhov

  10. CONSISTENCY CHECKS Example: LBM-2 Energy Deposition in Hybrid IR Phase I Upgrade - N. Mokhov

  11. Particle Tracks for 1 pp-event at 7x7 TeV Example: SYM-1 Energy Deposition in Hybrid IR Phase I Upgrade - N. Mokhov

  12. POWER DENSITY MAP: LBM-1 Energy Deposition in Hybrid IR Phase I Upgrade - N. Mokhov

  13. Power Density Profiles at Longitudinal Peaks: LBM-1 Quad ends Q1 non-IP Q3a IP Q2b non-IP Q3b IP Energy Deposition in Hybrid IR Phase I Upgrade - N. Mokhov

  14. POWER DENSITY MAP: LBM-2 Energy Deposition in Hybrid IR Phase I Upgrade - N. Mokhov

  15. POWER DENSITY MAP: SYM-1 Energy Deposition in Hybrid IR Phase I Upgrade - N. Mokhov

  16. Power Density Profiles at Longitudinal Peaks: SYM-1 Q1b non-IP end Q2b non-IP end Energy Deposition in Hybrid IR Phase I Upgrade - N. Mokhov

  17. QUENCH LIMITS & DESIGN GOAL Quench Limit Design Goal Energy Deposition in Hybrid IR Phase I Upgrade - N. Mokhov

  18. Low-betamax-1: Peak Power Density in Cable-1 vs z LBM-1: 42-mm TAS LBM-1: 55-mm TAS Energy Deposition in Hybrid IR Phase I Upgrade - N. Mokhov

  19. LBM-2 & SYM-1: Peak Power Density in Cable-1 vs z 55-mm aperture TAS SYM-1 LBM-2 Energy Deposition in Hybrid IR Phase I Upgrade - N. Mokhov

  20. Peak Power Density wrt Design Limits Energy Deposition in Hybrid IR Phase I Upgrade - N. Mokhov

  21. HEAT LOADS • At L=2.5x1034 cm-2 s-1, pp-interactions result in power of 2.24 kW per beam carried out from IP1 and IP5. About 1/3 of this power is deposited in the TAS and triplet. • Power dissipation in the TAS scales with the luminosity and decreases with aperture increase thus giving rise to the power deposited in cold components. • TAS: 455W at 34mm, 360W at 42mm, and 283W at 55mm. • Heat loads in low-betamax (LBM-2) optics (Watts): • 109 (Q1), 20 (MCBX), 74 (Q2a), 84 (Q2b), 25 (MQSX), • 7 (TASB), 80 (Q3), 11 (MCBXA), 27 (DFBX), 17 (vessel). Energy Deposition in Hybrid IR Phase I Upgrade - N. Mokhov

  22. HEAT LOAD BALANCE (Watts) 55-mm TAS Q1 to MCBXA ~ 40 m ~6.6 W/m ~7.7 W/m ~7.3 W/m LHe+”LN2” ~11 W/m LHe+”LN2” ~10 W/m LHe+”LN2” ~9.9 W/m Energy Deposition in Hybrid IR Phase I Upgrade - N. Mokhov

  23. SUMMARY (1) • There are always four pronounced peaks in longitudinal distributions of maximum power density in the first SC cable (averaged over the cable area at the azimuthal maxima): close to Q1 non-IP end, Q2a IP end, Q2b non-IP end and Q3 IP end (see also LHC PR 633, 2003). • For the configurations considered all the peaks are safely below the design limits (for 55-mm TAS). • Increasing TAS aperture from 42 to 55mm, increases first peak by 10% and heat load to the cold components by 75 W. • 3-mm tungsten absorbers in Q1 provides reduction of peaks by a factor of about 3 and 2 in Q1 and Q2, respectively, compared to the stainless steel ones. Energy Deposition in Hybrid IR Phase I Upgrade - N. Mokhov

  24. SUMMARY (2) • Peak in Q3 is practically insensitive to the configuration. • Compared to the nominal case,dynamic heat loads to theSC quads are certainly higher at 2.5x1034 cm-2 s-1 and enlarged TAS aperture, but – because of larger quad apertures and use of absorbers - seem to be manageable, especially with high-Z absorbers cooled at LN2. • Using Nb3Sn for Q1 or Q3 instead of NbTi substantially increases operational margins, frees space for instrumentation between quads, and provides verification of this new technology for Phase II. • Thanks to J. Johnstone for optics, V. Kashikhin for quad geometry and magnetic field maps, I. Rakhno & S. Striganov for enhancement of analysis tools, and A. Zlobin for coordination. Energy Deposition in Hybrid IR Phase I Upgrade - N. Mokhov