An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Energy Savings Performance Contracts Measurement & Verification

  2. What Is Measurement And Verification (M&V)? M&V is a process of tracking and verifying project energy savings as specified in the contractually agreed M&V plan

  3. Benefits ofM&V • Objectively tracks project performance • Building owner • ESCO • Maximizes project savings • Monitors equipment performance • Provides accounting and budget data • Benchmark savings for potential projects in similar buildings

  4. Project M&V Process • Develop M&V Plan • Target key project risks • Establish Project Baseline • Implement monitoring • Periodic reporting

  5. M&V Plan Elements • Key performance goals for this project • Which M&V protocol(s) will be used to achieve these goals? • What data will be measured, calculated, simulated, or estimated in the selected M&V methodology? • Estimated annual costs for M&V program. • Sample savings report showing all data, calculations and summary results

  6. Project Performance Factors • Project audit and design • Equipment selection • Project construction and commissioning • Long-term operations and maintenance • Equipment performance M&V does not substitute for other project performance tasks

  7. Project Performance FactorsAudit and Design • Does the ESCO understand your facility? • Do you accept the ESCO’s whole facility energy model? • Are the ESCO’s savings estimates reasonable? Catch and correct errors before they get built into the project

  8. Project Performance FactorsEquipment Selection • Is the proposed equipment described in adequate detail? • Will the equipment produce the savings? • Are you technically comfortable with using this equipment? • Track record, mfrs. warranties, etc. • Can you maintain this equipment? Don’t overestimate your appetite for technical innovation or your maintenance capabilities.

  9. Project Performance FactorsConstruction/Commissioning • Construction management process • Who represents the owner in the field? • Commissioning process • Project acceptance process Once you accept the project, it’s yours.

  10. Project Performance FactorsLong Term O&M • Who will maintain the new equipment? • Does the ESCO or manufacturer offer adequate training and ongoing support? • Can you adjust equipment operation for changes in facility use? Good maintenance = savings achieved.

  11. Project Equipment Performance • Does equipment work as specified? • Is equipment achieving estimated savings? • Has the performance of non-project related equipment changed energy use significantly? This is the target of an M&V plan.

  12. Standard M&V Protocols • International Performance Measurement and Verification Protocol (IPMVP), www.nrel.gov/docs/fy02osti/31505.pdf or www.evo-world.org/index.php • American Society of Heating, Refrigeration and Air Conditioning Engineers (ASHRAE) guideline 14 (covers IPMVP options B, C, and D in more technical detail), go to: http://www.ashrae.org

  13. IPMVP M&V Protocols • Option A – One time savings measurement as the basis for future stipulated savings • Option B - Measured consumption by end use over time • Option C - Whole facility analysis with utility meter measurements • Option D - Calibrated simulation calculations

  14. M&V ProtocolsMatch To Technology • Option A – Lighting • Option B – Chiller Plant, VAV • Option C –Demand Response, Water • Option D – Building Envelope

  15. M&V ProtocolsSelection Factors • Number and complexity of ECMS • Value of projected ECM savings • Uncertainty of savings • Savings risk allocation • Other value produced by M&V data • Availability and capability of an EMS

  16. Project M&VData Logging Equipment • Isolates affected end-use from total building meter • Quantifies parameters for engineering calculations and simulation models (e.g., temperatures, run times, control settings) • Corrects catalog data estimates which can vary by application, design, quality of installation, and control

  17. Project M&VData Issues • Match data collection to M&V protocol • Understand available sources of data • Maintain and/or upgrade data sources • Establish good monitoring practices Garbage in = garbage out

  18. Project M&V Data Sources • Utility bills • Facility sub-meter readings • Weather data • Outputs from building EMS • Logs of building operation &maintenance data • Reports on building changes from maintenance staff • Specialmetering & benchmark measurements

  19. Project M&VGood Monitoring Practices • Collecting relevant data from building operators and occupants is essential to effective monitoring • Building operators need timely, focused performance data to rapidly identify and correct system performance problems • Monitoring provides incentives for optimizing operations & maintenance, and documenting savings performance. Everyone is more careful when they know results are monitored

  20. Project M&VGood Monitoring Practices • Monitoring personnel should be trained to interpret the data collected • Collect baseline data before the audit • Electronic monitoring for loads with large demand • Monitoring data should be provided in easy to understand graphic formats

  21. Project M&VCalculating Savings • Turn data into useful information • Specify how measurements or calculated data will be used to verify savings • Provide sample calculations • Specify time intervals for measurements and calculations • Specify standard format for written monitoring reports

  22. Project M&VPeriodic Reports • Document the periodic savings report schedule, review and approval process • Report consumption and cost savings in units/dollars and percentage of target savings in both graphic and numeric format • Clearly identify data sources, time periods, utility cost data, report author and contact data • Explain variances from predicted savings performance • Require documentation of calculations to support material change adjustments to savings and/or baselines

  23. Project M&VCost Considerations • Cost effective M&V produces data with a value greater than the cost of measurement • M&V methodology must produce consistent results no matter who uses the procedure • M&V must produce timely, reasonably accurate results • Value of M&V is a function of dollars at risk

  24. Project M&VDefining The Base Year • Base year is the mutually agreed upon pre-retrofit annual utility consumption and cost for your building or a specific energy using system • Base year provides the basis for the technical and economic analysis of potential energy conservation measures • Base year provides the basis for measuring and/or calculating the value of future energy savings

  25. Project M&VBase Year Problems • Selected year ≠ current building use, because of: • Changes in building equipment, structures, schedule, occupancy, or control set-points • Equipment not functioning during base year • Extraordinary operations and maintenance work • Consumption data are inaccurate or missing due to utility metering, billing, or data entry errors • Changes in utility rates

  26. Project M&VBase Year Problems • Quantifying the correlation between current building conditions and current energy use is inaccurate because of changes in: • Equipment operating conditions, sizes, loads, and schedules • Existing lighting levels, ventilation rates, temperature, and humidity • Run hours of equipment  operating hours of building • Run hours of equipment  facility staff estimates • Actual annual equipment loads  full load rating nameplate (e.g., average motor operates at 60% of full load rating)

  27. Project M&VRecap Of Success Factors • Good project M&V provides: • Timely method of measuring savings • Methodologies acceptable to client and ESCO • Clearly defined measurement and calculation methods • Cost-effective measurement and calculation methods • Value of measurements are a function of the dollars at risk

  28. Project M&VTypical Challenges • Poorly defined M&V plan • M&V report lacks supporting calculations • Missing equipment/operations data • No standardized schedules/formats for data, calculations and reporting • Difficulty of monitoring the impacts of facility changes on ECM performance

  29. Project M&V Lighting Example –Why Details Matter • Lighting system kW varies with fixture and ballast type • Even with good documentation, getting fixture counts more accurate than  3% may be impractical in very large facilities • Pre-retrofit condition is often more efficient than engineering estimates • Post-retrofit condition is often less efficient than engineering estimates (e.g., inaccurate demand diversity)

  30. Performance Guarantees Verifiable or Not? • Types of Savings • Energy • Rate Savings • Efficient Equipment • Efficient Operating Methods • Operational and Maintenance • Labor • Material • External Service Contracts • Capital Avoidance Which are guaranteed by the ESCO?

  31. Documenting High Performance • What do you need to document and maintain higher performance? • Reliable monitored data • Understanding of the data • Active cooperation of site operators • Easy to understand graphic formats • Continuous commissioning CLOSE THE FEEDBACK LOOP TO CHASE PERFORMANCE

  32. Operation And Monitoring • Well-run, inefficient systems often work better than efficient systems poorly run • Equipment access • Proper budget • Adequate training • Incentives for good O&M • Good GUI for building control systems • Immediate access to critical efficient components

  33. M&V Plan Requirements for Adherence To IPMVP Description of baseline conditions and energy data: • Energy and demand profiles • Occupancy type, density and period • Space conditions for each operating period • Equipment inventory • Equipment operating practices • Significant equipment problems

  34. M&V Plan Requirements For Adherence To IPMVP • Description of planned changes to base year conditions • Identification of reporting period • Establishment of conditions to which all energy measurements will be adjusted • Documentation of the procedures used to verify proper installation of the ECM

  35. M&V Plan Requirements for Adherence To IPMVP • Specification of IPMVP Option • Specification of data analysis procedures • Specification of metering points and meter characteristics • Option specific information (e.g., simulation software used under Option D)

  36. M&V Plan Requirements For Adherence To IPMVP • Specification of quality assurance procedures • Quantification of expected accuracy associated with measurement and analysis • Specification of how results will be reported and documented

  37. M&V Plan Requirements For Adherence To IPMVP • Specification of data available for savings verification by a third party • Descriptions of how non-routine baseline adjustments will be made • Definition of budget and resource requirements for the M&V effort

  38. Key Findings In Savings Uncertainty Analysis • Uncertainty in baselines is a key contributor to savings estimates • Document and collect the best possible data on equipment performance: • Quantity • Capacity (size) • Operating Efficiency Curve • Operating hours