90 likes | 224 Views
The Hydrological and Meteorological Monitoring, Forecasting and Protection System B.2 Component. B.2.7 Task The equipment for the measurement and maintenance teams Managing team: - Task Leader - Andrzej Maciążek Realization period: 25.09.2000 – up to now
E N D
The Hydrological and Meteorological Monitoring, Forecasting and Protection SystemB.2 Component B.2.7 Task The equipment for the measurement and maintenance teams Managing team: - Task Leader - Andrzej Maciążek Realization period: 25.09.2000 – up to now Realization price: depending on particular tasks Emergency Flood Recovery Project - Poland, Loan No 4264 POL
PURPOSE - B.2.7 – The equipment for the measurement and maintenance teams • Enhancing the quality of measurements and the efficiency of actions by providing up-to-date diagnostic measures and equipment for measurement and maintenance teams, including water and land transport means Emergency Flood Recovery Project - Poland, Loan No 4264 POL
SCOPE - B.2.7 – The equipment for the measurement and maintenance teams • B.2.7.2. - Procurement of geodetic apparatus • B.2.7.3. - Procurement of computers for the measurement and maintenance teams • B.2.7.4.A - Purchase of equipment for ultrasonic flow measurement • B.2.7.4.B - Purchase of hydrometric equipment Emergency Flood Recovery Project - Poland, Loan No 4264 POL
SCOPE - B.2.7 – The equipment for the measurement and maintenance teams • B.2.7.4.C - Procurement and installation of 50 meteorological stations • B.2.7.4.D,F,G – Procurement of the equipment for the measurement and maintenance teams (water transport vessels, trailers, tools) • B.2.7.4.E – Procurement of land vehicles Emergency Flood Recovery Project - Poland, Loan No 4264 POL
SCOPE - B.2.7 – The equipment for the measurement and maintenance teams • B.2.7.5 - Procurement, installation and implementation of the controlling equipment for the measurement instruments calibration laboratory • Modernization of wind tunnel • Construction of Pressure Calibration Bench • Construction of Temperature Calibration Bench • Construction of Humidity Calibration Bench • Construction of and the equipment for Mobile Meteorological Laboratory Emergency Flood Recovery Project - Poland, Loan No 4264 POL
B.2.7.2. B.2.7.3 B.2.7.4.A B.2.7.4.B B.2.7.4.C B.2.7.4.DFG B.2.7.4.E B.2.7.5 704 300 PLN 170 000 USD 296 196 USD 1 623 124 DEM 1 125 482 EUR 2 637 771,52 PLN 2 145 747,76 PLN 2 257 040 PLN 306 000 USD PHASES - B.2.7 – The equipment for the measurement and maintenance teams(in red – in progress) Emergency Flood Recovery Project - Poland, Loan No 4264 POL
STATUS as on 30.09.2003 - B.2.7 – The equipment for the measurement and maintenance teams In progress • B.2.7.3. - Procurement of computers for the measurement and maintenance teams • B.2.7.5 - Procurement, installation and implementation of the controlling equipment for measurement instruments calibration laboratory • Other tasks have been completed and implemented Emergency Flood Recovery Project - Poland, Loan No 4264 POL
B.2.7 The equipment for the measurement and maintenance teams • MEASUREMENTS MADE BY NEWER AND MORE EFFECTIVE EQUIPMENT • SERVICE AND MAINTENANCE OF MEASUREMENT NETWORK BETTER THAN BEFORE • HYDROMETRIC MEASUREMENTS OF THE WHOLE RANGE OF FLOW [HIGH WATER MEASUREMENTS] • MOBILEMEASUREMENT AND MAINTENANCE TEAMS, ICLUDING THE TEAMS TO MAINTAIN INSTALLATIONS BELONGING TO RZGW Emergency Flood Recovery Project - Poland, Loan No 4264 POL
B.2.7 The equipment for the measurement and maintenance teams - IN THIS RESPECT IMGW DOES NOT ANTICIPATE THE EFFECTS OF TASKS PERFORMED BY RZGW Emergency Flood Recovery Project - Poland, Loan No 4264 POL