1 / 8

The Hydrological and Meteorological Monitoring, Forecasting and Protection System B.2 Component

The Hydrological and Meteorological Monitoring, Forecasting and Protection System B.2 Component. B.2.5 Task Upgrade of telecommunication and information technology system and development of Client Service System. Managing team: - Task Leader - Jan Orłowski

spence
Download Presentation

The Hydrological and Meteorological Monitoring, Forecasting and Protection System B.2 Component

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The Hydrological and Meteorological Monitoring, Forecasting and Protection SystemB.2 Component B.2.5 Task Upgrade of telecommunication and information technology system and development of Client Service System. Managing team: - Task Leader - Jan Orłowski Deputy Task Leader – Marzena Kawecka, Zdzisław Starzyński Realization period: 31 August 2000 – November 2002 Realization price: 6 359 649 USD Emergency Flood Recovery Project - Poland, Loan No 4264 POL

  2. PURPOSE - B.2.5 Task - Upgrade of telecommunication and information technology system and development of Client Service System • Upgrade of telecommunication and information technology system at National Hydro-Meteorological Services • Development of Client Service System Emergency Flood Recovery Project - Poland, Loan No 4264 POL

  3. SCOPE - B.2.5 Task - Upgrade of telecommunication and information technology system and development of Client Service System. • Upgrade and implementation of local and wide area networks. • Implementation of LAN/WAN monitoring and control systems. • Installation of digital exchanges in Regional Branch Offices and IMGW’s Headguartes. • Increase the capacity of IMGW backbone network channels. • Provide backup links for IMGW’s backbone network. • Connect OKI in Cracow and Wroclaw to WAN Emergency Flood Recovery Project - Poland, Loan No 4264 POL

  4. SCOPE - B.2.5 Task - Upgrade of telecommunication and information technology system and development of Client Service System. Client Service System: - Data collection module (ftp, e-mail, lfs), - Data storage module (Oracle database), - Data and products distribution module (e-mail, ftp, fax, sms), - Data and products presentation module by means of www browser (presentation of text and graphical data with animation function). Emergency Flood Recovery Project - Poland, Loan No 4264 POL

  5. PHASES - B.2.5 Task - Upgrade of Data Transmission and Development of Client Service System. Emergency Flood Recovery Project - Poland, Loan No 4264 POL

  6. STATUS as on 30.09.2003 - B.2.5 Task - Upgrade of Data Transmission and Development of Client Service System. COMPLETED Emergency Flood Recovery Project - Poland, Loan No 4264 POL

  7. B.2.5 Task Upgrade of Data Transmission and Development of Client Service System. Warsaw FIREWALL DB SH RZGW WROCLAW Cracow DB SH RZGW CRACOW Emergency Flood Recovery Project - Poland, Loan No 4264 POL

  8. B.2.5 Task Upgrade of Data Transmission and Development of Client Service System. WAN IMGW RZGW CRACOW WROCLAW SOK Emergency Flood Recovery Project - Poland, Loan No 4264 POL

More Related