1 / 4

Tuesday 11 th September

Tuesday 11 th September. Vacuum intervention Point 4 following leak wire scanner beam1 Bake-out of pumping group during the day Removal of wire scanner early evening Pumping over-night, opening of valves early morning VIP visit IP2

elana
Download Presentation

Tuesday 11 th September

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Tuesday 11thSeptember • Vacuum intervention Point 4 following leak wire scanner beam1 • Bake-out of pumping group during the day • Removal of wire scanner early evening • Pumping over-night, opening of valves early morning • VIP visit IP2 • Test of different beam modes and state machines for experiments • Access: • ATLAS, LHCb • RD1.LR5 for quench MD preparation • Removal of bake-out jackets two MKI tanks IP2 • LBDS pulsing in local • BI for head-tail monitor • RF investigations of SPS re-phasing FESA class problems with (p, Pb) • TI8 extraction tests for MKE stability tests with INDIV beam • LHCb dipole presently fault off LHC 8:30 meeting

  2. Wire Scanner – Bernd Dehning & BI team LHC.BWS.5L4.B2H1:NB_PTS_SCAN_IN----3768LHC.BWS.5L4.B2H2:NB_PTS_SCAN_IN----8124LHC.BWS.5L4.B2V1:NB_PTS_SCAN_IN----3541LHC.BWS.5L4.B2V2:NB_PTS_SCAN_IN----6690LHC.BWS.5R4.B1H1:NB_PTS_SCAN_IN-----781LHC.BWS.5R4.B1H2:NB_PTS_SCAN_IN---10247LHC.BWS.5R4.B1V1:NB_PTS_SCAN_IN-----651LHC.BWS.5R4.B1V2:NB_PTS_SCAN_IN----9468  • the scanner is dismounted and a closing flange is mounted • the wire has been recuperated for analysis • the resistivity of all b1 scanners have been measured before and after the opening of the vacuum, integrity check • the number of the scans of all LHC scanners see below • the broken scanner has had 10000 • we are intending to switch all scanners tomorrow morning to the spare scanner, which are less often used • the scanner mechanics is in the radioactive equipment storage to be released by RP LHC 8:30 meeting

  3. Vacuum status LHC 8:30 meeting

  4. The Plan • Wednesday, today • 08:30 Vac back in to Point 4 for final checks and equipment removal. Expect to be back in business towards the end of the morning • When vac is out, RF tests with higher HV on the klystrons for about 1 h (parallel to pre-cycle) • pPb pilot run – 13 bunches each beam (max 24 h) • Thursday • 1000 m beta*, few bunches (max 24 h) • Friday • AM: pPb MD with 318 p+ bunches w. 4 Pb bunches (1 shift) • Test ramp, reversed LHCb polarity and split collision beam process • SPS switched over to Q20 optics • Physics LHC 8:30 meeting

More Related