1 / 20

FM Shanghai Compound Material Co .,LTD F-M 소재 공장

FM Shanghai Compound Material Co .,LTD F-M 소재 공장. 12/ 29 /20 10. Contents 내용. FM Corporation Strategy FM 전략 FMCM Introduction FMCM 소개 Material Relocation A- 590 재질 생산처 변경 A- 590 Material Validation 재질 검증. FM Corporation Strategy FM 전략.

Download Presentation

FM Shanghai Compound Material Co .,LTD F-M 소재 공장

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. FM Shanghai Compound Material Co .,LTDF-M 소재 공장 12/29/2010

  2. Contents 내용 • FM Corporation Strategy FM 전략 • FMCM Introduction FMCM 소개 • Material Relocation A-590 재질 생산처 변경 A-590 • Material Validation 재질 검증

  3. FM Corporation StrategyFM 전략 • Federal Mogul produces bi-metallic strip for bearings, bushings, and washers at many locations around the world. 패더럴 모글은 전세계에 걸쳐 많은 지역에서 베어링, 부싱, 와셔를 위해 바이메탈을 생산하고 있다. • With the intention that the products and service are able to be provided to AP OEMs considerately and timely, as result of FM corporation strategy, a new raw material company was built in Shanghai in Oct,2007,that is FM Shanghai Compound Material Co .,LTD. 제품과 서비스를 주의 깊게 적시에 아시아 OEM 에 공급 할 수 있게 하려는 의도이며, FM 의 전력의 일환으로 FM CM 신규소재 공장을 2007년 10월에 상해에 건립 했다. • The target is to standardize the bearing alloys globally and thus to simply replicate the material properties made in different locations 목표는 표준화 된 베어링 합금, 즉 각 다른지역에서 만들어 지는 재질을 쉽게 재질특성을 복제하는 것이다.

  4. FM Corporation Strategy-ContinueFM 전략 • These material fabricating lines are not new processes for the receiving plants just with facility relocated. 이들 재질 생산 라인은 신규 공정이 아니라 설비 재배치로 소재 수급 공장을위한 것이다. • In production, chemistry and microstructure are checked on every batch of material to approve for manufacturing. 양산에서, 화학성분, 조직이 제조 승인을 위해 매 생산 시마다 검사 된다. • Especially the process and parts will be approved by FM Global Bearing technical center which is located Wiesbaden, Germany. 특히, 공정과 제품은 독일 비스바덴에 위치해 있는 FM 글로벌 베어링 연구소에서 승인 될 것이다. • The properties of A370 and A-590 alloy made at FMCM are summarized hereinafter. FMCM에서 생산되는 A-370과 A-590 재질 특성은 다음장에 요약 되었다.

  5. FMCM IntroductionFMCM 소개 • 1993 - XiangSheng Company is established • 1993 – 샹생회사 설립 • 2007 - FMCM is formed as a JV between Federal Mogul(60%) and SAIC (40%) with intent to purchase XiangSheng • 2007 – FMCM은 XiangSheng 구매 목적으로 FM(60%) 과 SAIC 간에 JV로 형성 되었다. • FMCM was strategically created as a regional supplier • FMCM은 그 지역 공급자로 세워졌다. • FMCM took control of XiangSheng in October of 2007 • FMCM은 2007년 10월에 XiangSheng 관리를 시작 했다. • FMCM is investing roughly $8,000,000 in 2008 • FMCM은 2008년도에 대략 8백만불(약96억원)을 투자 하고 있다. • FMCM will have the second largest aluminum strip production capacity in the world by 2010 • FMCM은 2010년부터 세계에서 두번째로 가장큰 알루미늄 소재 생산처가 될 것이다. • FMCM will be unified with FMSBC and be relocated to Zhoupu Town, Shanghai • FMCM은 FMSBC와 통합되어 질 것이며, 상해 Zhoupu 에 재 배치 될 것이다.

  6. Management Organization 관리 조직 Andy Collins General Manager 总经理 Danzhong Huang(黄旦中) Deputy General Manager 副总经理 Haichang Shan (单海昌) CCP Secretary & Chairman of Labor Union 工会书记兼主席 Jinsheng Zhou (周金生) Purchase Manager 采购经理 Tony Zheng (郑万春) Finance/ITManager 财务/IT 经理 Hong Li (李红) Labor Union Female Rep 工会女职工代表 Haichang Shan (单海昌) HR/Admin Manager 行政人事经理 Haichang Shan (单海昌) Manufacturing Manager 生产经理 生产控制主管 叶世凤 PC/LSupervisor 物流主管 Ren Qingzheng (任庆政) QualitySupervisor 质量主管 Peter Liu (刘孝龙) EngineeringManager 工程经理 Gao Fei (高飞) EHSCoordinator EHS 协调员

  7. Program Team Structure프로그램 팀 구조

  8. Offshore Support – YTD 2010 2010 해외 지원

  9. Quality Assurance System품질 보증 시스템

  10. Facility Location 공장 위치 F-M Asia &Pacific Tech Center F-M 아시아 퍼시픽 기술연구소 Downtown Shanghai 상해시내

  11. A-590 Process Flow A-590공정흐름도 1) Roll Casting 2) Homogenization (균질화) 3) Alloy roll down 4.8 mm HTR(열처리) RCS CRS 4) Si-growth 5) Sanding 6) Hot Bonding, brush Alloy Steel 2hi HTR(열처리) CRS RBL

  12. Roll Caster System롤 주조 시스템(RCS)

  13. Cladding Rolling Down and SandingCRS

  14. Brush Cleaning LineBCL세척 라인

  15. Roll Bonding LineRBL압연 라인 Length 63 m

  16. Automatic Gage Control 자동 게이지 관리

  17. Lab Instrument 실험 장비 Microscope Semi-polisher Image Software Optical Emission Spectrometer

  18. FM Internal ReleaseFM승인

  19. FMSBC Approval • SGM SGM400/GEN3 • Sample Prep. 15-Nov-09 • GM On-site Audit 3-Dec-09 • Material Report 18-Jan-10 • Sapphire Test 22-Jan-10 • PPAP Submission 2-Feb-10 • Engine Test 5-Feb-10 • SGM Approval 25-Jun-10 • SOP 30-Jun-10 • SVW EA111 • Sample submit 6-Jul-09 • Condition Approval 19-Sep-09 • SVW On-site Audit 22-Oct-09 • Sapphire test 24-Nov-09 • PPAP Submit 8-Jan-10 • VW China Approval 29-Jan-10 • Germany BMG Approval 12-Feb-10 • SOP 24-Feb-10 • Other Approval- K4 1.8, WD615, Firefox • K4 1.8 Got a preliminary approval from Shanghai Motor on April 28 • WD615 forecast to get the approval in August • Sample has submitted to the customer and the trial run and approval is underway

  20. 타사 적용 타사 적용 주요 아이템 외 10여종 6/21/2010

More Related