1. 1 Lecture 2.2b: Proposal Process, RFP, SOW, CLINS, DIDs, and Forming Team Projects Dr. John MacCarthy
UMBC CMSC 615
Fall, 2006
2. 2 Agenda Proposal Process
RFPs
SOWs
CLINs List
Typical Products and Services
DIDs
Class Project RFP/SOW
Class Project CLINs List & DIDs
Form Project Teams
3. 3 Proposal/Contract Process Phase I: Government Preparation of an RFP
Source Selection Plan
Membership/Responsibilities of Source Selection Team
Evaluation Criteria
Detailed Evaluation Procedures
Statement of Objectives (SOO) [Statement of Need (SON)]
Statement of Work (SOW)
Section 1: Scope
Section 2: Applicable Documents
Section 3: Requirements
Contract Data Requirements List (CDRL)
Request for Proposals (RFPs) Phase II: Contractor Preparation of Proposals
PMP/SEMP
WBS
Schedule
Cost Estimate
Key Personnel
Past Performance
Requirements Analysis Artifacts
Conceptual Design
Phase III: Government Source Selection (Proposal Evaluation)
Technical
Management
Past Performance
Phase IV: Contract/Contract Award
Phase V: Start Project
4. 4 The Statement of Work (SOW) Definition: The document that specifies the scope of the contract. It generally includes:
A description of the work to be performed
A description of the system to be developed
A concept of operations for the system
A set of high level requirements for the system
A description of the work that the customer expects the contractor to perform
A CLINs List: a list of products (and services) to be provided by the contractor.
A DID for each document/artifact CLIN: a description of the content and format of key deliverables
Purpose: Defines the contract
5. 5 Contract Line Item Numbers (CLINs) List Definition: A numbered list of items (products and/or services) that the contractor is contractually obligated to deliver to the customer (i.e. contractual deliverables)
Purpose: The principal means for the customer to evaluate contractor performance
Generally a SOW will come with a CLINs List
Often the customer will ask the contractor to make SOW/CLINs recommendations
Generally the contractor will propose additions/deletions
Generally allocated to WBS Elements and then to Work Packages
6. 6 Data Item Description (DID) Definition: A description of the content and structure of a key document/artifact CLIN
Purpose: The principal means for the customer to covey their expectations of document/artifact content and structure
Generally there will be DID for each artifact CLIN
Often the customer will ask the contractor to propose and/or review the DIDs
Generally the contractor will propose modifications
7. 7 Typical SE Services and Products Some Typical Services:
Systems Engineering Management
System Architecting
Requirements Generation
Configuration Management
Systems Analysis
Modeling and Simulation
Validation and Verification Support
Reviews and Audits Some Typical Products:
Work Packages
Plans
Systems Engineering Plan
Risk Management Plan
Configuration Management Plan
Selected Quality Management Procedures
Architecture Artifacts
Specifications
Analyses/Trade Studies
System Models/Simulations
8. 8 Class Project Customer System Specification/Description See Word File
9. 9 Class CLINs List and DIDs CLINs List:
Homework 1-10
SEP
Requirements Document
Architecture Artifacts
Research Papers
Project Briefing
Project Notebook
Midterm Exam
Final Exam DIDs:
Homework 1-10: see Lecture 1 & each assignment
SEP: See Reference SEP Annotated Outline
Requirements Document: IEEE-830
Architecture Artifacts: Lecture Notes
Research Paper: see Lecture 1
Project Briefing: TBD
Project Notebook: see Lecture 1
Midterm Exam: TBD
Final Exam: TBD
10. 10 Form Project Teams 3-4 people per team