110 likes | 234 Views
Seals Patented Installation System. Working Area Preparation ( Step by step ). You need the following :. * 1 seal jig. * 1 adapted installation tool. * 1 glue roller. Seal jig :. seal jig is designed to work on all A4 seals. You can ajust seals on left side…. if you turn the jig over….
E N D
Seals Patented Installation System Working Area Preparation ( Step by step )
You need the following : * 1 seal jig * 1 adapted installation tool * 1 glue roller
Seal jig : seal jig is designed to work on all A4 seals You can ajust seals on left side… if you turn the jig over… … or right side…
Adapted installation tool : 2 tools exist, one for HP 1010 / 1200 , one for AX / HP 1320 AX one is wider than HP 1200 one….
Glue roller : is really inexpensive, use Pritt permanent glue
First step : Place seal jig in front of you Place seals on the jig
Second step : pasting the tool Tool has to be sticky enough to hold the seal, But less sticky than seal’s adhesive, otherwise, seal will not stick on hopper and will stay on the tool…. Take glue roller and place glue on bottom both ends of the tool ( 2 cm ) plus 2-3 cm in the middle
Third step : Place the insertion toll on the seal, Using jig and handle as guides
Then….. Act as shown on my video… If you do not see the video, please look at www.proton.fr home page…..
!! Important Tip !! Always replace installation toll on next seal : * In this case, one gluing operation can last a full work day * You are saving few more time on production operations * Tooling will last much longer without anymore maintenance
Has been proud to show you it’s french patented sealing system…..