An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. APEC-TEL Broadband Study TEL03/2009A – status report Bangkok, May 20th

  2. Project status Overview Current status of the project Part Activities Next steps Status I • Final draft ready after several internal reviews • Work package has been approved and signed off done II • Work package has been approved and signed off done • Final draft ready after several internal reviews III • Work package has been approved and signed off done • Final draft ready after several internal reviews IV • Work package has been approved and signed off done • Final draft ready after several internal reviews Workshop Preparation • Prepare and conduct APEC-TEL44 workshop (Malaysia, end of September) • Final report including approved Part I-IV done • Finalized executive summary, introduction, conclusion, appendix and glossary

  3. Project timelines Overview The project started on 22.12.2010. It is structured into 5 parts as outlined in the RFP document. 2010 2011 2012 Dec Jan Feb Mar Apr May Jun Jul Aug Sep Jan Work Package WP 1:Analysis of current broadband development and internet usage (Task 1-11) Data collection Write up Draft WP1 Survey (develop, align) Survey (send out, get feedback) WP 2: PPP for investment in broadband Development (Task 12-18) All content creation and activities planned for the study has been finished Regulatory policy intervention Industrial policy intervention Draft WP2 Consider survey input WP 3: Analysis of social impacts on broadband development and internet usage (Task 19-22) Context analysis Draft WP3 Consider survey input WP 4: Best practices in broadband development and internet usage (Task 23-27) Best practices in BB development Recommendations for implementation Draft WP4 WP 5: Workshop and final report(Task 28-32) Prepare and conduct workshop review & approval TEL44 tbc Final report (OSIPTEL-DETECON-APEC) today 1st draft WP1-4 2nd draft WP1-3 Final Report Page2