E N D
1. BMA CHILLER UPGRADE PROJECT
2. CURRENT BMA FACILITY
3. CURRENT BMA FACILITY
4. HISTORY Before 1994
Chiller water was purchased from JHU
After 1994
480 ton ice thermal storage system
215 ton screw chiller
Backup connection to JHU for chiller water
695 ton capacity with peak demand of 720 ton
5. PLANNING TIMELINE Doreen walkthroughDoreen walkthrough
6. CHILLER PLANT AFTER THE PROJECT Chiller water capacity
600 ton centrifugal chiller
480 ton ice machine
215 ton screw chiller
Free cooling capacity during winter.
A new temporary chiller connection port for hook up.
7. Project budget 1.9 million
Actual cost 1.76 million
Duration 12 month
8. ELECTRICITY SAVINGS